Sparely
DU

O-RING,NBR,137MM ID,3.5MM CS

Material 4100019691 · O-RING · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100019691
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 10 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 20 EA/year: 19 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 3.Lead time ~29 days; expected demand during lead time 1.5.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 32.
  • 5.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
Safety-critical (SCE)Last turnaround used 52Price estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
4 / 10
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 11
Rec. Max
32
order qty 20
Service level
99.9%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 14 days ago, 7 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (60 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 10 functional locations

4 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_SDV-526
VD-219 SHUTDOWN VALVE
B100.06
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PY_PP-1022B
INHIBITOR PUMP
S141.05
PX_PP-148A
REFLUX PUMP
S120.62
PX_SDV-1156A
RECYCLE ETHANE ISOLATION
S100.06

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
12 Aug 2026MediumPY_PP-1022BPP-1022B abnormal noise
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
11 Jun 2026LowPX_KT-264ALeak from packing
24 May 2026HighPX_KT-383AKT-383A steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
17 Sept 20265201000022353Corrective
07 Jun 20268203000002440Turnaround
31 Jan 202630203000033471Turnaround
23 Nov 202522203000033105Turnaround
15 May 20253205000033454Other maintenance