Sparely
DU

O-RING,NBR,168MM ID,2.5MM CS

Material 4100019710 · O-RING · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100019710
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 9 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 6.9 EA/year: 6.9 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~29 days; expected demand during lead time 0.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 13.
  • 5.On hand 3 + on order 0 is at or below the reorder point: order 10 now.
  • 6.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 396,840 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)Last turnaround used 6Abnormal consumptionPrice estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
13
order qty 7
Service level
100.0%
stockout risk now 4%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 139 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Lumpy · 7 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 9 functional locations

6 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PX_KC-178A
QUENCH OIL FAN
A100.57
PX_PP-1049
PROPYLENE PUMP
A100.19
PX_PP-765B
QUENCH OIL PUMP
A100.19
PX_KC-371B
BOTTOM FAN
B100.57
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_SDV-153A
ON-OFF VALVE
S200.06
PX_SDV-1561
QUENCH WATER ISOLATION
S100.06

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
04 Jun 2026HighPX_KC-778AInspect coupling KC-778A
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
05 Nov 2025MediumPX_KC-778AKC-778A lube oil filter DP high
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
15 May 20261201000007315Corrective
11 Mar 20261201000007497Corrective
18 Jan 20262201000011584Corrective
03 Jan 20261201000039014Corrective
26 Dec 20251201000017507Corrective
17 Dec 20256203000037460Turnaround
14 Sept 20255201000003651Corrective
11 Sept 20256201000011051Corrective