O-RING,VITON,148MM ID,5.3MM CS

Material 4100019733 · O-RING · Plant 1000

ASafety-criticalMaintainHealthy
Material
4100019733
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 7 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
25 d · P80 26 d
Unit price
Rp 184,584

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 13 EA/year: 13 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~25 days; expected demand during lead time 0.9.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 23.
  • 5.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 36% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 4Single source
On hand / on order
23 / 0
no open PO
Today Min / Max
6 / 17
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 9
Rec. Max
23
order qty 14
Service level
100.0%
stockout risk now 0%
Unit price
Rp 184,584
PO history
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 10 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 7 functional locations

5 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-247A
SLOP OIL FAN
A194.00
PX_KC-317B
RICH AMINE FAN
A141.85
PX_KC-930C
SLOP OIL FAN
A100.57
PX_PP-1101A
REFLUX PUMP
A100.19
PX_PP-1928
FUEL OIL PUMP
B131.05
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_SDV-396
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 25 ± 12 days (PO history, 5 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
25 Aug 2026PR06
Regular replenishment
12Rp 177,49607 Sept 202613 d
08 Jul 2026PR03
Regular replenishment
12Rp 189,69730 Jul 202622 d
17 May 2026PR03
Regular replenishment
5Rp 182,86404 Jun 202618 d
10 Mar 2026PR05
Project / turnaround
10Rp 184,58402 Apr 202623 d
19 Aug 2025PR06
Regular replenishment
6Rp 186,52224 Sept 202536 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Aug 2026HighPX_KC-247AInspect coupling KC-247A
14 Jul 2026MediumPX_KC-247AReplace lamp as per PM finding
08 Jul 2026HighPX_PP-1928PP-1928 discharge pressure low
04 Jul 2026LowPX_KC-317BReplace lamp as per PM finding
29 Jun 2026LowPX_KC-247AKC-247A high vibration
04 Jun 2026LowPX_KC-247AKC-247A bearing temp high
06 Apr 2026MediumPX_KC-247AKC-247A bearing temp high
30 Mar 2026MediumPX_KC-317BKC-317B lube oil filter DP high
05 Mar 2026MediumPX_PP-1928Oil leak at PP-1928 bearing housing
20 Nov 2025MediumPX_KC-247AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20263201000023143Corrective
28 Jan 20267201000035370Corrective
09 Jan 20261201000016973Corrective
25 Dec 20252203000006078Turnaround
20 Dec 20254201000028335Corrective
19 Nov 20253201000030240Corrective
17 Nov 20252203000011208Turnaround
03 Nov 20251201000038265Corrective
02 Aug 20252204000037748Preventive
31 May 20258203000017246Turnaround