O-RING,NBR,243MM ID,5.3MM CS

Material 4100019823 · O-RING · Plant 1000

AReorderCriticalStockout
Material
4100019823
Category
O-RING
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
BERKAH LOGAM GLOBAL PT
Lead time
27 d · P80 32 d
Unit price
Rp 93,569

Recommendation

  • 1.Forecast 12 EA/year: 12 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~27 days; expected demand during lead time 0.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 23.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 23 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 2.2M · order by 01 Oct 2026
Expected arrival ≈ 27 days
Convert to Stock ItemLast turnaround used 14Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
23
order qty 13
Service level
100.0%
stockout risk now 24%
Unit price
Rp 93,569
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 6 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (16 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-902B
BFW PUMP
A182.33
PX_PP-679B
METHANOL PUMP
B171.90
PX_PP-210A
HYDROGEN PUMP
B110.19

Lead time and procurement

Lead time 27 ± 14 days (PO history, 4 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
17 Mar 2026PR03
Regular replenishment
11Rp 94,01106 Apr 202620 d
28 Dec 2025PR06
Regular replenishment
11Rp 92,63710 Jan 202613 d
22 Dec 2025PR06
Regular replenishment
6Rp 94,90418 Jan 202627 d
03 Dec 2025PR06
Regular replenishment
14Rp 93,12712 Jan 202640 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-679BOverhaul PP-679B
20 Sept 2026MediumPX_PP-679BPP-679B seal leak
22 Aug 2026MediumPX_PP-679BPP-679B high vibration
19 Jul 2026MediumPX_PP-679BInstall scaffolding at PP-679B
18 Jul 2026LowPX_PP-902BReplace lamp as per PM finding
02 Mar 2026MediumPX_PP-902BInstall scaffolding at PP-902B
26 Feb 2026MediumPX_PP-902BInstall cover plate for MCP cracking
22 Dec 2025MediumPX_PP-679BOverhaul PP-679B
26 Nov 2025HighPX_PP-902BPP-902B abnormal noise
28 Oct 2025MediumPX_PP-679BInstall scaffolding at PP-679B

Recent goods issues

Posting dateQtyOrderOrder type
25 Sept 20262209000029477Other maintenance
07 Mar 20262203000020244Turnaround
29 Jan 20263201000036610Corrective
14 Jan 20264201000025741Corrective
09 Jan 20262204000030643Preventive
26 Dec 202512203000033731Turnaround
11 Dec 20251201000019351Corrective
09 Dec 20257201000001903Corrective
07 Nov 20252203000004034Turnaround