O-RING,VITON,83MM ID,3.5MM CS
Material 4100019838 · O-RING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100019838
- Category
- O-RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Forecast 2.6 EA/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 198,420 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 2%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 216 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 770.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-588 CAUSTIC FAN | A | 1 | 2 | 1.00 |
| PX_PP-679B METHANOL PUMP | B | 1 | 7 | 1.90 |
| PX_PP-413C LEAN AMINE PUMP | B | 1 | 0 | 0.19 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_PP-148A REFLUX PUMP | S | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_PP-679B | Overhaul PP-679B |
| 20 Sept 2026 | Medium | PX_PP-679B | PP-679B seal leak |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 22 Aug 2026 | Medium | PX_PP-679B | PP-679B high vibration |
| 19 Jul 2026 | Medium | PX_PP-679B | Install scaffolding at PP-679B |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 22 Feb 2026 | Medium | PX_KC-588 | KC-588 lube oil filter DP high |
| 25 Jan 2026 | Medium | PX_PP-148A | PP-148A discharge pressure low |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Feb 2026 | 1 | 201000006302 | Corrective |
| 14 Oct 2025 | 1 | 201000015464 | Corrective |