O-RING,VITON,83MM ID,3.5MM CS

Material 4100019838 · O-RING · Plant 1000

AReorderNormalSlow-moving
Material
4100019838
Category
O-RING
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Forecast 2.6 EA/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 198,420 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 2%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 216 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 770.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-588
CAUSTIC FAN
A121.00
PX_PP-679B
METHANOL PUMP
B171.90
PX_PP-413C
LEAN AMINE PUMP
B100.19
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_PP-148A
REFLUX PUMP
S120.62

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-679BOverhaul PP-679B
20 Sept 2026MediumPX_PP-679BPP-679B seal leak
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
22 Aug 2026MediumPX_PP-679BPP-679B high vibration
19 Jul 2026MediumPX_PP-679BInstall scaffolding at PP-679B
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
22 Feb 2026MediumPX_KC-588KC-588 lube oil filter DP high
25 Jan 2026MediumPX_PP-148APP-148A discharge pressure low
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
27 Feb 20261201000006302Corrective
14 Oct 20251201000015464Corrective