O-RING,EPDM,110MM ID,5.3MM CS

Material 4100019872 · O-RING · Plant 1000

AMonitorHealthy
Material
4100019872
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
32 d · P80 44 d
Unit price
Rp 20,277

Recommendation

  • 1.Forecast 8.2 EA/year: 8.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~32 days; expected demand during lead time 0.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 15.
  • 4.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
  • 5.ML early warning: 52% probability of demand in the next 90 days.
ML early warningSingle sourceAbnormal consumptionOpen PO
On hand / on order
5 / 5
next delivery 02 Nov 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
15
order qty 9
Service level
99.9%
stockout risk now 0%
Unit price
Rp 20,277
PO history
ML early warning: 52% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 14 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 5 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 6 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KC-513
WASH WATER BLOWER
S1104.42
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_PP-148A
REFLUX PUMP
S120.62

Lead time and procurement

Lead time 32 ± 16 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
21 Sept 2026PR06
Regular replenishment
5Rp 20,27702 Nov 2026
open
42 d
25 Aug 2026PR03
Regular replenishment
2Rp 21,05011 Sept 202617 d
02 Nov 2025PR06
Regular replenishment
4Rp 20,00418 Dec 202546 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026MediumPX_KC-513KC-513 high vibration
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
07 Sept 2026MediumPX_KC-513Inspect coupling KC-513
05 Sept 2026LowPX_KC-513Inspect coupling KC-513
30 Aug 2026MediumPX_KC-513KC-513 high vibration
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
12 Jul 2026MediumPX_KC-513Inspect coupling KC-513
20 Jun 2026MediumPX_KC-513KC-513 bearing temp high
04 Jun 2026HighPX_KC-778AInspect coupling KC-778A
11 May 2026MediumPX_KC-513Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
17 Sept 20261201000029503Corrective
25 Jun 20261201000034485Corrective
04 Feb 20263201000034763Corrective
23 Sept 20251201000021098Corrective
03 Sept 20256201000018068Corrective