O-RING,VITON,290MM ID,5.3MM CS

Material 4100019924 · O-RING · Plant 1000

ASafety-criticalMaintainHealthy
Material
4100019924
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
RAJAWALI PERKASA JAYA PT
Lead time
24 d · P80 23 d
Unit price
Rp 205,266

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.7 EA/year: 3.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~24 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 7.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 47% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 4Single source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
7
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 205,266
PO history
ML early warning: 47% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 163 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (4 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 747.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-536A
LUBE OIL BLOWER
A1114.42
PX_KC-575B
METHANE COMPRESSOR
S172.71
PX_SDV-1525B
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 24 ± 11 days (PO history, 3 PO lines) · on-time 15%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jul 2026PR03
Regular replenishment
6Rp 197,46019 Aug 202626 d
09 Jan 2026PR03
Regular replenishment
4Rp 205,26628 Jan 202619 d
13 Jul 2025PR03
Regular replenishment
4Rp 205,36128 Jul 202515 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
22 Sept 2026HighPX_KC-536AOverhaul
08 Aug 2026HighPX_KC-536AKC-536A bearing temp high
24 Jul 2026HighPX_KC-536AInstall scaffolding at KC-536A
15 Jul 2026LowPX_KC-575BReplace lamp as per PM finding
05 Jul 2026MediumPX_KC-536ALeak from packing
24 Jun 2026MediumPX_KC-536AKC-536A bearing temp high
31 Mar 2026MediumPX_KC-536AInstall scaffolding at KC-536A
20 Mar 2026MediumPX_KC-575BKC-575B bearing temp high
18 Jan 2026LowPX_KC-536AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
21 Apr 20262201000039223Corrective
30 Jan 20261201000004172Corrective
10 Nov 20254203000039046Turnaround
25 Aug 20252209000009999Other maintenance
20 Aug 20251201000014278Corrective