O-RING,VITON,290MM ID,5.3MM CS
Material 4100019924 · O-RING · Plant 1000
ASafety-criticalMaintainHealthy
- Material
- 4100019924
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- RAJAWALI PERKASA JAYA PT
- Lead time
- 24 d · P80 23 d
- Unit price
- Rp 205,266
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 3.7 EA/year: 3.7 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~24 days; expected demand during lead time 0.2.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 7.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 47% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 4Single source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
7
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 205,266
PO history
ML early warning: 47% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 163 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 747.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-536A LUBE OIL BLOWER | A | 1 | 11 | 4.42 |
| PX_KC-575B METHANE COMPRESSOR | S | 1 | 7 | 2.71 |
| PX_SDV-1525B ON-OFF VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 24 ± 11 days (PO history, 3 PO lines) · on-time 15%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jul 2026 | PR03 Regular replenishment | 6 | Rp 197,460 | 19 Aug 2026 | 26 d |
| 09 Jan 2026 | PR03 Regular replenishment | 4 | Rp 205,266 | 28 Jan 2026 | 19 d |
| 13 Jul 2025 | PR03 Regular replenishment | 4 | Rp 205,361 | 28 Jul 2025 | 15 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_KC-575B | Install scaffolding at KC-575B |
| 22 Sept 2026 | High | PX_KC-536A | Overhaul |
| 08 Aug 2026 | High | PX_KC-536A | KC-536A bearing temp high |
| 24 Jul 2026 | High | PX_KC-536A | Install scaffolding at KC-536A |
| 15 Jul 2026 | Low | PX_KC-575B | Replace lamp as per PM finding |
| 05 Jul 2026 | Medium | PX_KC-536A | Leak from packing |
| 24 Jun 2026 | Medium | PX_KC-536A | KC-536A bearing temp high |
| 31 Mar 2026 | Medium | PX_KC-536A | Install scaffolding at KC-536A |
| 20 Mar 2026 | Medium | PX_KC-575B | KC-575B bearing temp high |
| 18 Jan 2026 | Low | PX_KC-536A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Apr 2026 | 2 | 201000039223 | Corrective |
| 30 Jan 2026 | 1 | 201000004172 | Corrective |
| 10 Nov 2025 | 4 | 203000039046 | Turnaround |
| 25 Aug 2025 | 2 | 209000009999 | Other maintenance |
| 20 Aug 2025 | 1 | 201000014278 | Corrective |