O-RING,VITON,258MM ID,3.5MM CS
Material 4100019942 · O-RING · Plant 1000
CMonitorHealthy
- Material
- 4100019942
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 37 d · P80 67 d
- Unit price
- Rp 37,476
Recommendation
- 1.Forecast 6.7 EA/year: 6.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~37 days; expected demand during lead time 0.7.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 12.
Single source
On hand / on order
7 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
12
order qty 7
Service level
99.7%
stockout risk now 0%
Unit price
Rp 37,476
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 36 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 19.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~14 days.
Installed on 1 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1659A ETHYLENE PUMP | C | 3 | 3 | 1.05 |
Lead time and procurement
Lead time 37 ± 32 days (PO history, 3 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 May 2026 | PR03 Regular replenishment | 2 | Rp 36,505 | 21 May 2026 | 18 d |
| 09 Jan 2026 | PR03 Regular replenishment | 4 | Rp 38,695 | 18 Apr 2026 | 99 d |
| 30 Sept 2025 | PR06 Regular replenishment | 4 | Rp 37,476 | 20 Oct 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Jul 2026 | Medium | PX_PP-1659A | Replace lamp as per PM finding |
| 16 Mar 2026 | Medium | PX_PP-1659A | Oil leak at PP-1659A bearing housing |
| 19 May 2025 | Medium | PX_PP-1659A | PP-1659A discharge pressure low |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Aug 2026 | 2 | 201000028982 | Corrective |
| 02 Jul 2026 | 4 | 201000018333 | Corrective |
| 19 Jan 2026 | 3 | 201000014201 | Corrective |
| 18 Jan 2026 | 1 | 201000018559 | Corrective |