O-RING,EPDM,224MM ID,2.5MM CS
Material 4100019977 · O-RING · Plant 1000
SReorderNormalBelow reorder point
- Material
- 4100019977
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 2 FuncLocs A/B)
- Supplier
- BERKAH INSTRUMEN NUSANTARA PT
- Lead time
- 29 d · P80 32 d
- Unit price
- Rp 98,376
Recommendation
- 1.Forecast 8.9 EA/year: 8.2 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~29 days; expected demand during lead time 0.6.
- 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 12.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 9 now.
Proposed purchase requisition
9 EA
Rp 885,380 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Last turnaround used 4Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
12
order qty 9
Service level
97.8%
stockout risk now 2%
Unit price
Rp 98,376
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 77 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern Lumpy · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~14 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 29 ± 10 days (PO history, 4 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Mar 2026 | PR03 Regular replenishment | 3 | Rp 99,797 | 19 Apr 2026 | 33 d |
| 20 Dec 2025 | PR03 Regular replenishment | 4 | Rp 98,157 | 13 Jan 2026 | 24 d |
| 21 Nov 2025 | PR06 Regular replenishment | 7 | Rp 98,594 | 22 Dec 2025 | 31 d |
| 15 Nov 2025 | PR04 Regular (other) | 7 | Rp 94,144 | 12 Dec 2025 | 27 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 24 May 2026 | High | PX_KT-383A | KT-383A steam leak at gland |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 23 Jun 2025 | Medium | PX_KT-383A | KT-383A governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Jul 2026 | 3 | 201000025691 | Corrective |
| 20 Dec 2025 | 4 | 203000033370 | Turnaround |
| 18 Dec 2025 | 7 | 201000038754 | Corrective |
| 12 Dec 2025 | 2 | 201000021748 | Corrective |
| 09 Oct 2025 | 1 | 201000002598 | Corrective |
| 23 Aug 2025 | 1 | 201000006861 | Corrective |