O-RING,EPDM,20MM ID,3.5MM CS

Material 4100020051 · O-RING · Plant 1000

AReorderNormalBelow reorder point
Material
4100020051
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.8.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 24.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 23 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 912,732 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 13
Rec. Max
24
order qty 11
Service level
100.0%
stockout risk now 18%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 743.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PP-743D
METHANOL PUMP
C120.62

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Apr 2026MediumPX_PP-743DLeak from packing
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
04 May 2025MediumPX_PP-743D[MSI-B-25-AXB-205] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000015377Corrective
27 Dec 202510209000028897Other maintenance
12 Nov 20254201000034648Corrective
29 Jun 20252201000009633Corrective