O-RING,EPDM,190MM ID,5.3MM CS
Material 4100020098 · O-RING · Plant 1000
AMaintainCritical insurance spare
- Material
- 4100020098
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 65.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-391D QUENCH WATER COMPRESSOR | A | 1 | 2 | 1.43 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 27 Dec 2025 | Low | PX_KC-391D | Leak from packing |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
| 18 Jul 2025 | High | PX_KC-391D | KC-391D high vibration |
| 15 May 2025 | Low | PX_KT-419A | PSM25/Leak from packing |
Recent goods issues
Never issued in the 17-month history.