O-RING,NBR,31MM ID,2.5MM CS
Material 4100020100 · O-RING · Plant 1000
AReduceNon-moving
- Material
- 4100020100
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.Stock 19 exceeds the level to keep (6) by 13.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
19 / 0
no open PO
Today Min / Max
10 / 22
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 21.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-1862B FLUSHING OIL PUMP | A | 1 | 2 | 0.62 |
| PX_KC-397A DILUTION STEAM FAN | A | 1 | 1 | 0.57 |
| PX_KC-563B GASOLINE COMPRESSOR | B | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jul 2026 | Medium | PY_PP-1862B | [MSI-B-26-MNG-333/M] Replace line |
| 02 Jul 2025 | Low | PX_KC-397A | Painting KC-397A |
| 22 May 2025 | Low | PY_PP-1862B | PP-1862B seal leak |
Recent goods issues
Never issued in the 17-month history.