O-RING,EPDM,63MM ID,3.5MM CS

Material 4100020134 · O-RING · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100020134
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 10 EA/year: 9.7 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 3.Lead time ~29 days; expected demand during lead time 0.8.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 19.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 17 now.
  • 6.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
17 EA
Rp 674,628 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
19
order qty 11
Service level
99.9%
stockout risk now 17%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 365 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 724.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-588
CAUSTIC FAN
A121.00
PX_PP-1991A
FEED PUMP
A120.62
PX_SDV-557B
BF-109 SHUTDOWN VALVE
B100.06
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
22 Feb 2026MediumPX_KC-588KC-588 lube oil filter DP high
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
30 Sept 2025LowPX_PP-1991AReplace lamp as per PM finding
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A

Recent goods issues

Posting dateQtyOrderOrder type
01 Oct 20254201000003422Corrective