O-RING,NBR,36MM ID,5.3MM CS

Material 4100020136 · O-RING · Plant 1000

ASafety-criticalReorderCriticalInsurance gap
Material
4100020136
Category
O-RING
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.1 EA/year: 1.1 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~29 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 238,104 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 3%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 106.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 6 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A372.81
PX_KC-464A
CONDENSATE BLOWER
A121.43
PX_SDV-336
METHANE ISOLATION
A110.48
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_KC-856A
DEMIN WATER COMPRESSOR
S121.00
PX_KC-216B
LEAN AMINE FAN
S110.57

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
14 Jul 2026LowPX_KC-856AInstall scaffolding at KC-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
02 Oct 2025MediumPX_KC-464AKC-464A lube oil filter DP high
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.