Sparely
DU

O-RING,EPDM,103MM ID,5.3MM CS

Material 4100020286 · O-RING · Plant 1000

ASafety-criticalMonitorCritical insurance spare
Material
4100020286
Category
O-RING
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~29 days; expected demand during lead time 0.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 21.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 3 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_SDV-807
KC-222B SHUTDOWN VALVE
A400.06
PX_PP-350A
REFLUX PUMP
B120.19

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Jun 2026MediumPX_PP-350AInstall scaffolding at PP-350A
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
10 May 2025MediumPX_PP-350APSM25/PP-350A abnormal noise
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Never issued in the 17-month history.