O-RING,EPDM,40MM ID,2.5MM CS
Material 4100020328 · O-RING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100020328
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 26 d · P80 28 d
- Unit price
- Rp 12,534
Recommendation
- 1.Forecast 1.8 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~26 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 45% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 37,602 · order by 01 Oct 2026
Expected arrival ≈ 26 days
ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 12,534
PO history
ML early warning: 45% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 316 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 322.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1775A GASOLINE PUMP | A | 1 | 2 | 0.62 |
| PX_PP-490A REFLUX PUMP | B | 1 | 1 | 0.19 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 26 ± 12 days (PO history, 3 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Aug 2026 | PR04 Regular (other) | 1 | Rp 12,534 | 07 Sept 2026 | 28 d |
| 11 Jun 2026 | PR03 Regular replenishment | 2 | Rp 13,183 | 09 Jul 2026 | 28 d |
| 22 Sept 2025 | PR06 Regular replenishment | 1 | Rp 12,263 | 08 Oct 2025 | 16 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Aug 2026 | Medium | PX_PP-1775A | PP-1775A discharge pressure low |
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
| 30 May 2025 | Medium | PX_PP-490A | PP-490A discharge pressure low |
| 24 May 2025 | Medium | PX_PP-1775A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Nov 2025 | 1 | 201000022928 | Corrective |