O-RING,EPDM,40MM ID,2.5MM CS

Material 4100020328 · O-RING · Plant 1000

AReorderNormalSlow-moving
Material
4100020328
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
26 d · P80 28 d
Unit price
Rp 12,534

Recommendation

  • 1.Forecast 1.8 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~26 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 45% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 37,602 · order by 01 Oct 2026
Expected arrival ≈ 26 days
ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 12,534
PO history
ML early warning: 45% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 316 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 322.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1775A
GASOLINE PUMP
A120.62
PX_PP-490A
REFLUX PUMP
B110.19
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 26 ± 12 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
10 Aug 2026PR04
Regular (other)
1Rp 12,53407 Sept 202628 d
11 Jun 2026PR03
Regular replenishment
2Rp 13,18309 Jul 202628 d
22 Sept 2025PR06
Regular replenishment
1Rp 12,26308 Oct 202516 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Aug 2026MediumPX_PP-1775APP-1775A discharge pressure low
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A
30 May 2025MediumPX_PP-490APP-490A discharge pressure low
24 May 2025MediumPX_PP-1775AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
19 Nov 20251201000022928Corrective