Sparely
DU

O-RING,NBR,198MM ID,3.5MM CS

Material 4100020415 · O-RING · Plant 1000

BReduceNon-moving
Material
4100020415
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
32 d · P80 48 d
Unit price
Rp 17,069

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~32 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Stock 9 exceeds the level to keep (6) by 3.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
9 / 0
no open PO
Today Min / Max
4 / 12
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 17,069
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~14 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-624A
RECYCLE ETHANE BLOWER
B152.28

Lead time and procurement

Lead time 32 ± 17 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
27 Mar 2026PR06
Regular replenishment
1Rp 17,06910 May 202644 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Aug 2026MediumPX_KC-624AKC-624A high vibration
10 Aug 2026MediumPX_KC-624ALeak from packing
18 Jun 2026LowPX_KC-624AOverhaul
19 Feb 2026MediumPX_KC-624AOverhaul
25 May 2025LowPX_KC-624ARepair insulation KC-624A

Recent goods issues

Never issued in the 17-month history.