O-RING,EPDM,32MM ID,5.3MM CS
Material 4100020687 · O-RING · Plant 1000
BSafety-criticalReorderNormalCritical insurance spare
- Material
- 4100020687
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~29 days; expected demand during lead time 0.0.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
- 6.No issue in 17 months, but it protects critical equipment: keep it.
- 7.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 158,736 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 1%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 33.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-624A RECYCLE ETHANE BLOWER | B | 1 | 5 | 2.28 |
| PX_SDV-1195 COOLING WATER ISOLATION | S | 1 | 1 | 0.48 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Aug 2026 | Medium | PX_KC-624A | KC-624A high vibration |
| 10 Aug 2026 | Medium | PX_KC-624A | Leak from packing |
| 18 Jun 2026 | Low | PX_KC-624A | Overhaul |
| 19 Feb 2026 | Medium | PX_KC-624A | Overhaul |
| 06 Jun 2025 | Medium | PX_SDV-1195 | SDV-1195 limit switch faulty |
| 25 May 2025 | Low | PX_KC-624A | Repair insulation KC-624A |
Recent goods issues
Never issued in the 17-month history.