O-RING,EPDM,156MM ID,5.3MM CS
Material 4100020899 · O-RING · Plant 1000
SMonitorHealthy
- Material
- 4100020899
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Forecast 2.7 EA/year: 2.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.2.
- 3.A 98.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 4.
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
4
order qty 3
Service level
98.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 28 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~14 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-843 FUEL OIL COMPRESSOR | S | 1 | 21 | 8.28 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_KC-843 | Painting KC-843 |
| 16 Sept 2026 | Low | PX_KC-843 | Inspect coupling KC-843 |
| 29 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_KC-843 | [MSI-B-26-RLH-211] Permanent repair |
| 14 Aug 2026 | Medium | PX_KC-843 | KC-843 lube oil filter DP high |
| 06 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 02 Aug 2026 | Emergency | PX_KC-843 | [MSI-B-26-KRX-321] Permanent repair |
| 14 Jul 2026 | Medium | PX_KC-843 | KC-843 bearing temp high |
| 09 Jun 2026 | Low | PX_KC-843 | Overhaul |
| 20 May 2026 | Medium | PX_KC-843 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Sept 2026 | 1 | 201000017898 | Corrective |
| 17 Nov 2025 | 1 | 201000017157 | Corrective |