O-RING,NBR,121MM ID,5.3MM CS
Material 4100021152 · O-RING · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100021152
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 4.0 EA/year: 3.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 3.Lead time ~29 days; expected demand during lead time 0.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
- 5.On hand 4 + on order 0 is at or below the reorder point: order 5 now.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 198,420 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 123 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 492.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-235D DEMIN WATER FAN | A | 1 | 2 | 1.00 |
| PX_KC-397A DILUTION STEAM FAN | A | 1 | 1 | 0.57 |
| PX_SDV-1787B DILUTION STEAM ISOLATION | A | 1 | 0 | 0.06 |
| PX_KT-624A TURBINE FOR KC-624A | S | 1 | 3 | 2.39 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_KC-235D | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 07 Feb 2026 | Medium | PX_KT-624A | Replace lamp as per PM finding |
| 11 Nov 2025 | Medium | PX_KC-235D | Leak from packing |
| 02 Jul 2025 | Low | PX_KC-397A | Painting KC-397A |
| 17 Jun 2025 | Medium | PX_KT-624A | [MSI-B-25-SWV-127/M] Replace line |
| 16 May 2025 | Low | PX_KC-235D | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 May 2026 | 3 | 205000025141 | Other maintenance |
| 23 Dec 2025 | 1 | 201000022133 | Corrective |