O-RING,NBR,121MM ID,5.3MM CS

Material 4100021152 · O-RING · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100021152
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 4.0 EA/year: 3.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 3.Lead time ~29 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 5.On hand 4 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 198,420 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 123 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 492.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_KC-397A
DILUTION STEAM FAN
A110.57
PX_SDV-1787B
DILUTION STEAM ISOLATION
A100.06
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
11 Nov 2025MediumPX_KC-235DLeak from packing
02 Jul 2025LowPX_KC-397APainting KC-397A
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line
16 May 2025LowPX_KC-235DLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
31 May 20263205000025141Other maintenance
23 Dec 20251201000022133Corrective