Sparely
DU

O-RING,EPDM,242MM ID,5.3MM CS

Material 4100021201 · O-RING · Plant 1000

SReducePotentially obsolete
Material
4100021201
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 98.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
  • 4.Stock 8 exceeds the level to keep (3) by 5.
Price estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
98.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 478,346/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~14 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-447
TURBINE FOR KC-447
S1136.24

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
13 May 2026LowPX_KT-447KT-447 trip test
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
30 Mar 2026LowPX_KT-447Leak from packing
28 Mar 2026MediumPX_KT-447Follow up after steam upset KT-447
14 Mar 2026MediumPX_KT-447KT-447 steam leak at gland
14 Jan 2026MediumPX_KT-447Follow up after steam upset KT-447
21 Nov 2025MediumPX_KT-447Leak from packing
19 Nov 2025MediumPX_KT-447Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.