O-RING,EPDM,92MM ID,2.5MM CS
Material 4100021314 · O-RING · Plant 1000
SMonitorInsurance gap
- Material
- 4100021314
- Category
- O-RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 39,684 (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 98.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
98.0%
stockout risk now 2%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 478,346/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~14 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
Lead time and procurement
Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 14 Mar 2026 | Medium | PX_KT-447 | KT-447 steam leak at gland |
| 14 Jan 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 21 Nov 2025 | Medium | PX_KT-447 | Leak from packing |
| 19 Nov 2025 | Medium | PX_KT-447 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.