O-RING,EPDM,68MM ID,5.3MM CS
Material 4100021749 · O-RING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100021749
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- DUTA TEKNOLOGI ABADI PT
- Lead time
- 29 d · P80 48 d
- Unit price
- Rp 26,482
Recommendation
- 1.Forecast 5.8 EA/year: 5.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
- 4.On hand 2 + on order 1 is at or below the reorder point: order 9 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 238,338 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Single sourceOpen PO
On hand / on order
2 / 1
next delivery 10 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
12
order qty 6
Service level
99.9%
stockout risk now 1%
Unit price
Rp 26,482
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 183 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 580.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_PP-1216C FLUSHING OIL PUMP | B | 1 | 0 | 0.19 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
Lead time and procurement
Lead time 29 ± 17 days (PO history + category, 1 PO lines) · on-time 60%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Sept 2026 | PR06 Regular replenishment | 1 | Rp 26,482 | 10 Oct 2026 open | 29 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
| 06 Jul 2025 | Low | PX_KT-202 | KT-202 steam leak at gland |
| 15 May 2025 | Low | PX_KT-419A | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Apr 2026 | 3 | 201000012873 | Corrective |