O-RING,NBR,40MM ID,2.5MM CS
Material 4100021987 · O-RING · Plant 1000
SMaintainNo stock needed
- Material
- 4100021987
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 27 d · P80 48 d
- Unit price
- Rp 263,628
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~27 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 1%
Unit price
Rp 263,628
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 207,767/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~14 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-575B METHANE COMPRESSOR | S | 1 | 7 | 2.71 |
Lead time and procurement
Lead time 27 ± 17 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Aug 2026 | PR06 Regular replenishment | 2 | Rp 260,364 | 30 Aug 2026 | 19 d |
| 18 Nov 2025 | PR06 Regular replenishment | 2 | Rp 266,892 | 16 Dec 2025 | 28 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_KC-575B | Install scaffolding at KC-575B |
| 15 Jul 2026 | Low | PX_KC-575B | Replace lamp as per PM finding |
| 20 Mar 2026 | Medium | PX_KC-575B | KC-575B bearing temp high |
| 13 Dec 2025 | Medium | PX_KC-575B | Replace lamp as per PM finding |
| 03 Nov 2025 | Emergency | PX_KC-575B | Replace lamp as per PM finding |
| 05 Sept 2025 | Medium | PX_KC-575B | Install scaffolding at KC-575B |
| 05 Jun 2025 | Medium | PX_KC-575B | Overhaul |
Recent goods issues
Never issued in the 17-month history.