O-RING,EPDM,30MM ID,2.5MM CS
Material 4100022642 · O-RING · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100022642
- Category
- O-RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 25 d · P80 48 d
- Unit price
- Rp 123,897
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 6.3 EA/year: 6.3 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~25 days; expected demand during lead time 0.4.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 27.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 27 now.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
27 EA
Rp 3.3M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)Last turnaround used 2Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 18
Rec. Max
27
order qty 9
Service level
100.0%
stockout risk now 5%
Unit price
Rp 123,897
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 204 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 210.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 2 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 3 | 2 | 1.53 |
| PX_SDV-1783 KC-513 SHUTDOWN VALVE | B | 1 | 1 | 0.06 |
Lead time and procurement
Lead time 25 ± 17 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Oct 2025 | PR06 Regular replenishment | 7 | Rp 123,897 | 19 Oct 2025 | 14 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 05 May 2025 | Low | PX_SDV-1783 | Check SDV-1783.ok |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Mar 2026 | 9 | 201000016499 | Corrective |
| 20 Dec 2025 | 2 | 203000035272 | Turnaround |