O-RING,EPDM,30MM ID,2.5MM CS

Material 4100022642 · O-RING · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100022642
Category
O-RING
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
25 d · P80 48 d
Unit price
Rp 123,897

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 6.3 EA/year: 6.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~25 days; expected demand during lead time 0.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 27.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 27 now.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
27 EA
Rp 3.3M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)Last turnaround used 2Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 18
Rec. Max
27
order qty 9
Service level
100.0%
stockout risk now 5%
Unit price
Rp 123,897
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 204 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 210.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 2 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A321.53
PX_SDV-1783
KC-513 SHUTDOWN VALVE
B110.06

Lead time and procurement

Lead time 25 ± 17 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
05 Oct 2025PR06
Regular replenishment
7Rp 123,89719 Oct 202514 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
05 May 2025LowPX_SDV-1783Check SDV-1783.ok
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
11 Mar 20269201000016499Corrective
20 Dec 20252203000035272Turnaround