O-RING,EPDM,207MM ID,3.5MM CS

Material 4100022798 · O-RING · Plant 1000

SMonitorSlow-moving
Material
4100022798
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Forecast 5.1 EA/year: 5.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.4.
  • 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 8.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
8
order qty 6
Service level
98.3%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 318 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~14 days.

Installed on 1 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-843
FUEL OIL COMPRESSOR
S3218.28

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_KC-843Painting KC-843
16 Sept 2026LowPX_KC-843Inspect coupling KC-843
29 Aug 2026MediumPX_KC-843Replace lamp as per PM finding
26 Aug 2026MediumPX_KC-843[MSI-B-26-RLH-211] Permanent repair
14 Aug 2026MediumPX_KC-843KC-843 lube oil filter DP high
06 Aug 2026MediumPX_KC-843Replace lamp as per PM finding
02 Aug 2026EmergencyPX_KC-843[MSI-B-26-KRX-321] Permanent repair
14 Jul 2026MediumPX_KC-843KC-843 bearing temp high
09 Jun 2026LowPX_KC-843Overhaul
20 May 2026MediumPX_KC-843Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
17 Nov 20252201000017157Corrective