O-RING,VITON,62MM ID,2.5MM CS
Material 4100022906 · O-RING · Plant 1000
BReorderNormalBelow reorder point
- Material
- 4100022906
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 36 d · P80 48 d
- Unit price
- Rp 69,885
Recommendation
- 1.Forecast 10 EA/year: 10 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~36 days; expected demand during lead time 1.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 19, order up to 30.
- 4.On hand 10 + on order 0 is at or below the reorder point: order 20 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
20 EA
Rp 1.4M · order by 01 Oct 2026
Expected arrival ≈ 36 days
Single source
On hand / on order
10 / 0
no open PO
Today Min / Max
6 / 16
static parameters in BoM
Rec. Min (reorder point)
19
safety stock 19
Rec. Max
30
order qty 11
Service level
100.0%
stockout risk now 1%
Unit price
Rp 69,885
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 11 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 80.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~14 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1765B BOTTOM PUMP | B | 1 | 1 | 0.62 |
Lead time and procurement
Lead time 36 ± 12 days (PO history, 4 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Apr 2026 | PR03 Regular replenishment | 6 | Rp 71,288 | 17 Jun 2026 | 48 d |
| 29 Mar 2026 | PR03 Regular replenishment | 4 | Rp 68,481 | 05 May 2026 | 37 d |
| 11 Mar 2026 | PR03 Regular replenishment | 4 | Rp 67,544 | 28 Apr 2026 | 48 d |
| 05 Jul 2025 | PR06 Regular replenishment | 5 | Rp 72,143 | 08 Aug 2025 | 34 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Jun 2025 | Low | PX_PP-1765B | PP-1765B abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2026 | 1 | 201000023715 | Corrective |
| 03 Jul 2025 | 4 | 201000006950 | Corrective |
| 03 Jul 2025 | 14 | 201000006950 | Corrective |