O-RING,EPDM,166MM ID,5.3MM CS

Material 4100023223 · O-RING · Plant 1000

SSafety-criticalReorderCriticalStockout
Material
4100023223
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
ANUGRAH INSTRUMEN SENTOSA PT
Lead time
28 d · P80 48 d
Unit price
Rp 33,912

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.2 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 3.Lead time ~28 days; expected demand during lead time 0.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 3.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
Proposed purchase requisition
3 EA
Rp 101,736 · order by 01 Oct 2026
Expected arrival ≈ 28 days
Safety-critical (SCE)Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
3
order qty 2
Service level
99.9%
stockout risk now 4%
Unit price
Rp 33,912
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 158.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-875
TURBINE FOR KC-875
S101.10
PX_SDV-1417
VD-1232 SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 28 ± 17 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jul 2025PR03
Regular replenishment
2Rp 33,91221 Aug 202525 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 May 2027PX_SDV-1417Final Element Overhaul; ONOFFV0.72

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
11 Jan 20261201000033496Corrective