Sparely
DU

O-RING,NBR,197MM ID,3.5MM CS

Material 4100023418 · O-RING · Plant 1000

BSafety-criticalReorderCriticalStockout
Material
4100023418
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
CAHAYA ELEKTRIK JAYA PT
Lead time
28 d · P80 48 d
Unit price
Rp 10,033

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~28 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 18.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 18 now.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
18 EA
Rp 180,594 · order by 01 Oct 2026
Expected arrival ≈ 28 days
Safety-critical (SCE)Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
6 / 17
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 9
Rec. Max
18
order qty 9
Service level
100.0%
stockout risk now 2%
Unit price
Rp 10,033
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 278 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 60.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-526
VD-219 SHUTDOWN VALVE
B100.06

Lead time and procurement

Lead time 28 ± 17 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
28 Jul 2025PR03
Regular replenishment
3Rp 10,03322 Aug 202525 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Dec 20259201000036790Corrective