Sparely
DU

O-RING,VITON,206MM ID,2.5MM CS

Material 4100023937 · O-RING · Plant 1000

AReduceNon-moving
Material
4100023937
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 48 d
Unit price
Rp 39,684 (est.)

Recommendation

  • 1.Forecast 1.7 EA/year: 0.3 unplanned (installed-base failure prior (no history)) + 1.4 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Stock 12 exceeds the level to keep (6) by 6.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 39,684
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 28.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 1 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-167
GASOLINE PUMP
A252.33

Lead time and procurement

Lead time 29 ± 17 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-167Pump overhaul1.43

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Jul 2026MediumPX_PP-167Replace bearing PP-167
04 Mar 2026MediumPX_PP-167Leak from packing
28 Dec 2025MediumPX_PP-167Replace lamp as per PM finding
04 Nov 2025LowPX_PP-167PP-167 abnormal noise
07 Jun 2025MediumPX_PP-167Replace bearing PP-167

Recent goods issues

Never issued in the 17-month history.