STUDBOLT,7/8INX60MM,B8M/8M
Material 4100024158 · STUDBOLT · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100024158
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (142 of 228 FuncLocs A/B, 18 safety/shutdown valve)
- Supplier
- BERKAH ENERGI MAKMUR PT
- Lead time
- 18 d · P80 24 d
- Unit price
- Rp 60,244
Recommendation
- 1.Safety-critical element: installed on 18 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 5,069 EA/year: 5,028 unplanned (recency-weighted compound poisson (own history)) + 40 from the maintenance plan.
- 3.Lead time ~18 days; expected demand during lead time 248.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 825, order up to 1,949.
- 5.Installed on 228 FuncLoc(s), 142 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 1,380Single sourceAbnormal consumptionOpen PO
On hand / on order
13 / 3,710
next delivery 07 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
825
safety stock 578
Rec. Max
1,949
order qty 1,124
Service level
99.9%
stockout risk now 0%
Unit price
Rp 60,244
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 55 issue days in the last 180 days, last issue 1 days ago, 163 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 28 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2,280 units) excluded from the baseline.
Demand pattern Smooth · 178 issue days · 10 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 26.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 228 functional locations
142 with criticality A/B · 3,176 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 8 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 4 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 24 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 4 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 12 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 24 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 20 | 23 | 9.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 4 | 23 | 9.01 |
| PY_KC-419A PROPYLENE FAN | A | 20 | 19 | 5.71 |
| PX_CL-457 FEED SCRUBBER | A | 20 | 11 | 3.80 |
| PX_HE-278D COOLING WATER TLE | A | 12 | 9 | 3.65 |
| PX_KT-856A TURBINE FOR KC-856A | A | 8 | 7 | 2.81 |
Lead time and procurement
Lead time 18 ± 9 days (PO history, 66 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Sept 2026 | PR06 Regular replenishment | 3,710 | Rp 59,369 | 07 Oct 2026 open | 22 d |
| 11 Sept 2026 | PR04 Regular (other) | 4,235 | Rp 58,165 | 23 Sept 2026 | 12 d |
| 27 Aug 2026 | PR05 Project / turnaround | 4,654 | Rp 62,376 | 29 Sept 2026 | 33 d |
| 10 Aug 2026 | PR06 Regular replenishment | 3,684 | Rp 62,688 | 23 Aug 2026 | 13 d |
| 08 Aug 2026 | PR05 Project / turnaround | 3,470 | Rp 61,441 | 10 Sept 2026 | 33 d |
| 03 Aug 2026 | PR06 Regular replenishment | 1,672 | Rp 60,675 | 12 Aug 2026 | 9 d |
| 30 Jul 2026 | PR05 Project / turnaround | 1,980 | Rp 62,088 | 15 Sept 2026 | 47 d |
| 24 Jul 2026 | PR06 Regular replenishment | 2,275 | Rp 60,044 | 31 Jul 2026 | 7 d |
| 17 Jul 2026 | PR06 Regular replenishment | 4,670 | Rp 60,911 | 01 Aug 2026 | 15 d |
| 17 Jul 2026 | PR06 Regular replenishment | 2,749 | Rp 60,225 | 31 Jul 2026 | 14 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_LCV-1246 | Final Element Overhaul; Control Valve | 5.73 |
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 14.3 |
| 01 Apr 2027 | PX_PCV-1747 | Final Element Overhaul; CV | 14.3 |
| 02 Jul 2027 | PX_PP-135A | Pump overhaul | 5.73 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 30 Sept 2026 | Medium | PX_PP-1864 | Install scaffolding at PP-1864 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 29 Sept 2026 | Medium | PX_KC-575B | Install scaffolding at KC-575B |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 28 Sept 2026 | Low | PX_KC-886D | KC-886D high vibration |
| 28 Sept 2026 | Low | PX_PP-103 | Oil leak at PP-103 bearing housing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 24 | 201000007314 | Corrective |
| 30 Sept 2026 | 32 | 201000010300 | Corrective |
| 27 Sept 2026 | 72 | 209000029477 | Other maintenance |
| 26 Sept 2026 | 144 | 209000029477 | Other maintenance |
| 25 Sept 2026 | 32 | 201000017191 | Corrective |
| 24 Sept 2026 | 8 | 201000023228 | Corrective |
| 19 Sept 2026 | 96 | 201000003432 | Corrective |
| 19 Sept 2026 | 24 | 201000012640 | Corrective |
| 19 Sept 2026 | 24 | 209000036917 | Other maintenance |
| 19 Sept 2026 | 144 | 209000036917 | Other maintenance |
| 18 Sept 2026 | 4 | 201000033682 | Corrective |
| 09 Sept 2026 | 16 | 201000017342 | Corrective |
| 08 Sept 2026 | 32 | 204000010508 | Preventive |
| 05 Sept 2026 | 16 | 201000005647 | Corrective |
| 02 Sept 2026 | 32 | 201000024663 | Corrective |