Sparely
DU

STUDBOLT,7/8INX60MM,B8M/8M

Material 4100024158 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024158
Category
STUDBOLT
Base unit
EA
MRP type
Non Stock
Criticality
A (142 of 228 FuncLocs A/B, 18 safety/shutdown valve)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
18 d · P80 24 d
Unit price
Rp 60,244

Recommendation

  • 1.Safety-critical element: installed on 18 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5,069 EA/year: 5,028 unplanned (recency-weighted compound poisson (own history)) + 40 from the maintenance plan.
  • 3.Lead time ~18 days; expected demand during lead time 248.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 825, order up to 1,949.
  • 5.Installed on 228 FuncLoc(s), 142 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 1,380Single sourceAbnormal consumptionOpen PO
On hand / on order
13 / 3,710
next delivery 07 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
825
safety stock 578
Rec. Max
1,949
order qty 1,124
Service level
99.9%
stockout risk now 0%
Unit price
Rp 60,244
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 55 issue days in the last 180 days, last issue 1 days ago, 163 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 28 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2,280 units) excluded from the baseline.

Demand pattern Smooth · 178 issue days · 10 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 26.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 228 functional locations

142 with criticality A/B · 3,176 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A88230.86
PX_BF-112
CRACKING FURNACE BF-112
A47327.01
PX_BF-102
CRACKING FURNACE BF-102
A247128.72
PX_BF-103
CRACKING FURNACE BF-103
A43814.58
PX_BF-109
CRACKING FURNACE BF-109
A122911.58
PX_BF-104
CRACKING FURNACE BF-104
A242811.58
PX_BF-107
CRACKING FURNACE BF-107
A20239.01
PX_BF-111
CRACKING FURNACE BF-111
A4239.01
PY_KC-419A
PROPYLENE FAN
A20195.71
PX_CL-457
FEED SCRUBBER
A20113.80
PX_HE-278D
COOLING WATER TLE
A1293.65
PX_KT-856A
TURBINE FOR KC-856A
A872.81

Lead time and procurement

Lead time 18 ± 9 days (PO history, 66 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR06
Regular replenishment
3,710Rp 59,36907 Oct 2026
open
22 d
11 Sept 2026PR04
Regular (other)
4,235Rp 58,16523 Sept 202612 d
27 Aug 2026PR05
Project / turnaround
4,654Rp 62,37629 Sept 202633 d
10 Aug 2026PR06
Regular replenishment
3,684Rp 62,68823 Aug 202613 d
08 Aug 2026PR05
Project / turnaround
3,470Rp 61,44110 Sept 202633 d
03 Aug 2026PR06
Regular replenishment
1,672Rp 60,67512 Aug 20269 d
30 Jul 2026PR05
Project / turnaround
1,980Rp 62,08815 Sept 202647 d
24 Jul 2026PR06
Regular replenishment
2,275Rp 60,04431 Jul 20267 d
17 Jul 2026PR06
Regular replenishment
4,670Rp 60,91101 Aug 202615 d
17 Jul 2026PR06
Regular replenishment
2,749Rp 60,22531 Jul 202614 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_LCV-1246Final Element Overhaul; Control Valve5.73
26 Dec 2026PX_KT-264ATurbine major overhaul14.3
01 Apr 2027PX_PCV-1747Final Element Overhaul; CV14.3
02 Jul 2027PX_PP-135APump overhaul5.73

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
30 Sept 2026MediumPX_PP-1864Install scaffolding at PP-1864
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
28 Sept 2026LowPX_BF-106Peep door broken BF-106
28 Sept 2026LowPX_KC-886DKC-886D high vibration
28 Sept 2026LowPX_PP-103Oil leak at PP-103 bearing housing

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202624201000007314Corrective
30 Sept 202632201000010300Corrective
27 Sept 202672209000029477Other maintenance
26 Sept 2026144209000029477Other maintenance
25 Sept 202632201000017191Corrective
24 Sept 20268201000023228Corrective
19 Sept 202696201000003432Corrective
19 Sept 202624201000012640Corrective
19 Sept 202624209000036917Other maintenance
19 Sept 2026144209000036917Other maintenance
18 Sept 20264201000033682Corrective
09 Sept 202616201000017342Corrective
08 Sept 202632204000010508Preventive
05 Sept 202616201000005647Corrective
02 Sept 202632201000024663Corrective