STUDBOLT,5/8INX85MM,B7/2H
Material 4100024181 · STUDBOLT · Plant 1000
ASafety-criticalReduceExcess
- Material
- 4100024181
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (89 of 148 FuncLocs A/B, 13 safety/shutdown valve)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 39 d · P80 53 d
- Unit price
- Rp 58,478
Recommendation
- 1.Safety-critical element: installed on 13 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1,900 EA/year: 1,852 unplanned (recency-weighted compound poisson (own history)) + 49 from the maintenance plan.
- 3.Lead time ~39 days; expected demand during lead time 199.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 699, order up to 1,398.
- 5.Stock 2,983 exceeds the level to keep (1,680) by 1,303; the level includes the 1,680 used in the last turnaround.
- 6.Installed on 148 FuncLoc(s), 89 of them criticality A/B.
- 7.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 1,680Single sourceAbnormal consumptionOpen PO
On hand / on order
2,983 / 9,247
next delivery 09 Oct 2026
Today Min / Max
1,065 / 3,335
static parameters in BoM
Rec. Min (reorder point)
699
safety stock 501
Rec. Max
1,398
order qty 699
Service level
99.9%
stockout risk now 0%
Unit price
Rp 58,478
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 18 issue days in the last 180 days, last issue 1 days ago, 146 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 15 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2,052 units) excluded from the baseline.
Demand pattern Erratic · 86 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 11.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 148 functional locations
89 with criticality A/B · 2,280 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 12 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 4 | 82 | 30.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 8 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 12 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 20 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 12 | 28 | 11.58 |
| PX_CL-457 FEED SCRUBBER | A | 8 | 11 | 3.80 |
| PX_PP-902B BFW PUMP | A | 24 | 8 | 2.33 |
| PX_HE-1635C CHARGE GAS COOLER | A | 24 | 7 | 1.93 |
| PX_KT-419A TURBINE FOR KC-419A | A | 8 | 6 | 2.81 |
| PX_KT-397A TURBINE FOR KC-397A | A | 20 | 5 | 2.81 |
| PX_HE-1475 C4 PRODUCT COOLER | A | 24 | 3 | 1.08 |
Lead time and procurement
Lead time 39 ± 23 days (PO history, 37 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2026 | PR01 Import / long-lead | 899 | Rp 57,275 | 16 Feb 2027 open | 152 d |
| 13 Sept 2026 | PR03 Regular replenishment | 2,528 | Rp 56,363 | 28 Oct 2026 open | 45 d |
| 09 Sept 2026 | PR06 Regular replenishment | 1,541 | Rp 58,009 | 09 Oct 2026 open | 30 d |
| 07 Sept 2026 | PR06 Regular replenishment | 2,217 | Rp 57,633 | 23 Nov 2026 open | 77 d |
| 31 Aug 2026 | PR03 Regular replenishment | 2,062 | Rp 59,222 | 09 Oct 2026 open | 39 d |
| 26 Aug 2026 | PR03 Regular replenishment | 1,143 | Rp 58,460 | 18 Sept 2026 | 23 d |
| 20 Aug 2026 | PR03 Regular replenishment | 1,068 | Rp 59,471 | 26 Sept 2026 | 37 d |
| 15 Jul 2026 | PR03 Regular replenishment | 2,495 | Rp 59,447 | 05 Sept 2026 | 52 d |
| 05 Jul 2026 | PR06 Regular replenishment | 2,364 | Rp 60,673 | 31 Aug 2026 | 57 d |
| 30 Jun 2026 | PR06 Regular replenishment | 692 | Rp 56,391 | 25 Jul 2026 | 25 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 17.2 |
| 01 Jan 2027 | PX_PP-508D | Pump overhaul | 17.2 |
| 02 May 2027 | PX_PP-1213 | Pump overhaul | 14.3 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 26 Sept 2026 | Emergency | PX_KC-773A | Inspect coupling KC-773A |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 4 | 201000001081 | Corrective |
| 30 Sept 2026 | 48 | 201000001081 | Corrective |
| 30 Sept 2026 | 24 | 201000012524 | Corrective |
| 30 Sept 2026 | 24 | 201000026532 | Corrective |
| 23 Sept 2026 | 16 | 201000037585 | Corrective |
| 22 Sept 2026 | 24 | 201000009714 | Corrective |
| 18 Sept 2026 | 96 | 201000003432 | Corrective |
| 23 Aug 2026 | 96 | 201000023643 | Corrective |
| 10 Aug 2026 | 48 | 201000004838 | Corrective |
| 04 Aug 2026 | 48 | 201000004385 | Corrective |
| 29 Jul 2026 | 12 | 201000002390 | Corrective |
| 29 Jun 2026 | 12 | 201000019754 | Corrective |
| 19 Jun 2026 | 48 | 209000014083 | Other maintenance |
| 08 Jun 2026 | 12 | 201000007891 | Corrective |
| 07 Jun 2026 | 12 | 201000002105 | Corrective |