STUDBOLT,5/8INX85MM,B7/2H

Material 4100024181 · STUDBOLT · Plant 1000

ASafety-criticalReduceExcess
Material
4100024181
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (89 of 148 FuncLocs A/B, 13 safety/shutdown valve)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
39 d · P80 53 d
Unit price
Rp 58,478

Recommendation

  • 1.Safety-critical element: installed on 13 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1,900 EA/year: 1,852 unplanned (recency-weighted compound poisson (own history)) + 49 from the maintenance plan.
  • 3.Lead time ~39 days; expected demand during lead time 199.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 699, order up to 1,398.
  • 5.Stock 2,983 exceeds the level to keep (1,680) by 1,303; the level includes the 1,680 used in the last turnaround.
  • 6.Installed on 148 FuncLoc(s), 89 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 1,680Single sourceAbnormal consumptionOpen PO
On hand / on order
2,983 / 9,247
next delivery 09 Oct 2026
Today Min / Max
1,065 / 3,335
static parameters in BoM
Rec. Min (reorder point)
699
safety stock 501
Rec. Max
1,398
order qty 699
Service level
99.9%
stockout risk now 0%
Unit price
Rp 58,478
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 18 issue days in the last 180 days, last issue 1 days ago, 146 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 15 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2,052 units) excluded from the baseline.

Demand pattern Erratic · 86 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 148 functional locations

89 with criticality A/B · 2,280 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A1211442.86
PX_BF-106
CRACKING FURNACE BF-106
A48230.86
PX_BF-102
CRACKING FURNACE BF-102
A87128.72
PX_BF-103
CRACKING FURNACE BF-103
A123814.58
PX_BF-109
CRACKING FURNACE BF-109
A202911.58
PX_BF-104
CRACKING FURNACE BF-104
A122811.58
PX_CL-457
FEED SCRUBBER
A8113.80
PX_PP-902B
BFW PUMP
A2482.33
PX_HE-1635C
CHARGE GAS COOLER
A2471.93
PX_KT-419A
TURBINE FOR KC-419A
A862.81
PX_KT-397A
TURBINE FOR KC-397A
A2052.81
PX_HE-1475
C4 PRODUCT COOLER
A2431.08

Lead time and procurement

Lead time 39 ± 23 days (PO history, 37 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
17 Sept 2026PR01
Import / long-lead
899Rp 57,27516 Feb 2027
open
152 d
13 Sept 2026PR03
Regular replenishment
2,528Rp 56,36328 Oct 2026
open
45 d
09 Sept 2026PR06
Regular replenishment
1,541Rp 58,00909 Oct 2026
open
30 d
07 Sept 2026PR06
Regular replenishment
2,217Rp 57,63323 Nov 2026
open
77 d
31 Aug 2026PR03
Regular replenishment
2,062Rp 59,22209 Oct 2026
open
39 d
26 Aug 2026PR03
Regular replenishment
1,143Rp 58,46018 Sept 202623 d
20 Aug 2026PR03
Regular replenishment
1,068Rp 59,47126 Sept 202637 d
15 Jul 2026PR03
Regular replenishment
2,495Rp 59,44705 Sept 202652 d
05 Jul 2026PR06
Regular replenishment
2,364Rp 60,67331 Aug 202657 d
30 Jun 2026PR06
Regular replenishment
692Rp 56,39125 Jul 202625 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul17.2
01 Jan 2027PX_PP-508DPump overhaul17.2
02 May 2027PX_PP-1213Pump overhaul14.3

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
26 Sept 2026EmergencyPX_KC-773AInspect coupling KC-773A
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20264201000001081Corrective
30 Sept 202648201000001081Corrective
30 Sept 202624201000012524Corrective
30 Sept 202624201000026532Corrective
23 Sept 202616201000037585Corrective
22 Sept 202624201000009714Corrective
18 Sept 202696201000003432Corrective
23 Aug 202696201000023643Corrective
10 Aug 202648201000004838Corrective
04 Aug 202648201000004385Corrective
29 Jul 202612201000002390Corrective
29 Jun 202612201000019754Corrective
19 Jun 202648209000014083Other maintenance
08 Jun 202612201000007891Corrective
07 Jun 202612201000002105Corrective