STUDBOLT,3/4INX75MM,B8M/8M

Material 4100024218 · STUDBOLT · Plant 1000

ASafety-criticalReduceExcess
Material
4100024218
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (50 of 80 FuncLocs A/B, 9 safety/shutdown valve)
Supplier
BINTANG PERKASA ABADI PT
Lead time
14 d · P80 16 d
Unit price
Rp 75,132

Recommendation

  • 1.Safety-critical element: installed on 9 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 893 EA/year: 870 unplanned (recency-weighted compound poisson (own history)) + 23 from the maintenance plan.
  • 3.Lead time ~14 days; expected demand during lead time 47 (incl. 14 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 149, order up to 572.
  • 5.Stock 2,238 exceeds the level to keep (572) by 1,666.
  • 6.Installed on 80 FuncLoc(s), 50 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 120Single sourceAbnormal consumptionPlanned demand in lead time
On hand / on order
2,238 / 0
no open PO
Today Min / Max
653 / 1,243
static parameters in BoM
Rec. Min (reorder point)
149
safety stock 102
Rec. Max
572
order qty 423
Service level
99.9%
stockout risk now 0%
Unit price
Rp 75,132
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 17 issue days in the last 180 days, last issue 5 days ago, 98 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 9 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (312 units) excluded from the baseline.

Demand pattern Erratic · 54 issue days · 6 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 80 functional locations

50 with criticality A/B · 1,104 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A2011442.86
PX_BF-106
CRACKING FURNACE BF-106
A88230.86
PX_BF-112
CRACKING FURNACE BF-112
A247327.01
PX_BF-103
CRACKING FURNACE BF-103
A123814.58
PX_BF-107
CRACKING FURNACE BF-107
A4239.01
PX_KC-717
FLUSHING OIL COMPRESSOR
A2094.00
PX_KT-419A
TURBINE FOR KC-419A
A2462.81
PX_KC-222B
LEAN AMINE COMPRESSOR
A2051.85
PX_CL-961
LEAN AMINE COLUMN
A831.23
PX_CL-1475
C3 RECYCLE STRIPPER
A1620.81
PX_KC-106B
GASOLINE BLOWER
A1621.00
PX_KT-460B
TURBINE FOR KC-460B
A2021.96

Lead time and procurement

Lead time 14 ± 9 days (PO history, 16 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR03
Regular replenishment
367Rp 78,67222 Sept 202613 d
18 Aug 2026PR03
Regular replenishment
281Rp 74,40109 Sept 202622 d
31 Jul 2026PR03
Regular replenishment
795Rp 77,40406 Aug 20266 d
12 Jul 2026PR04
Regular (other)
733Rp 80,03612 Aug 202631 d
07 Jul 2026PR01
Import / long-lead
795Rp 79,38923 Jul 202616 d
29 Jun 2026PR03
Regular replenishment
458Rp 73,91406 Jul 20267 d
23 Jun 2026PR06
Regular replenishment
579Rp 74,65803 Jul 202610 d
16 Jun 2026PR03
Regular replenishment
357Rp 74,08123 Jun 20267 d
11 Apr 2026PR06
Regular replenishment
823Rp 75,16515 Apr 20264 d
04 Feb 2026PR06
Regular replenishment
847Rp 75,01112 Feb 20268 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_PCV-1543Final Element Overhaul; CV14.3
26 Dec 2026PX_KT-264ATurbine major overhaul8.59

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
28 Sept 2026LowPX_KC-886DKC-886D high vibration
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202696203000029840Turnaround
26 Sept 20268201000027243Corrective
08 Sept 20268201000030902Corrective
21 Aug 202696201000006257Corrective
20 Aug 20264201000024327Corrective
05 Aug 20268201000036260Corrective
24 Jun 202624201000031485Corrective
15 Jun 20268201000038458Corrective
04 Jun 202612201000022908Corrective
03 Jun 202624201000036841Corrective
29 May 202624201000005642Corrective
28 May 20268201000005642Corrective
25 May 202648201000012062Corrective
30 Apr 202612201000011527Corrective
25 Apr 20268201000026103Corrective