STUDBOLT,1/2INX80MM,B16/4

Material 4100024231 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024231
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (28 of 49 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
29 d · P80 40 d
Unit price
Rp 37,135

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 644 EA/year: 641 unplanned (recency-weighted compound poisson (own history)) + 2.9 from the maintenance plan.
  • 3.Lead time ~29 days; expected demand during lead time 52.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 192, order up to 702.
  • 5.Installed on 49 FuncLoc(s), 28 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 720Single sourceAbnormal consumption
On hand / on order
495 / 0
no open PO
Today Min / Max
191 / 526
static parameters in BoM
Rec. Min (reorder point)
192
safety stock 141
Rec. Max
702
order qty 510
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,135
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 11 issue days in the last 180 days, last issue 12 days ago, 46 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (720 units) excluded from the baseline.

Demand pattern Erratic · 40 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 49 functional locations

28 with criticality A/B · 652 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A2411442.86
PX_BF-107
CRACKING FURNACE BF-107
A16239.01
PX_HE-1483A
C4 PRODUCT COOLER
A4113.22
PX_CL-962
PROPYLENE SCRUBBER
A1283.38
PX_PP-1776B
RICH AMINE PUMP
A1283.62
PX_PP-1819A
SLOP OIL PUMP
A851.90
PX_CL-910
QUENCH OIL SCRUBBER
A441.23
PX_PP-1022
QUENCH WATER PUMP
A431.47
PX_PP-1156A
SEAL OIL PUMP
A431.05
PX_PP-207
INHIBITOR PUMP
A1231.47
PX_CL-1475
C3 RECYCLE STRIPPER
A820.81
PX_KT-460B
TURBINE FOR KC-460B
A1221.96

Lead time and procurement

Lead time 29 ± 16 days (PO history, 16 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jun 2026PR06
Regular replenishment
475Rp 36,58114 Jul 202635 d
22 May 2026PR06
Regular replenishment
683Rp 38,51201 Jul 202640 d
05 May 2026PR03
Regular replenishment
830Rp 35,67431 May 202626 d
23 Apr 2026PR03
Regular replenishment
612Rp 35,94809 May 202616 d
16 Apr 2026PR06
Regular replenishment
377Rp 35,66809 May 202623 d
18 Feb 2026PR06
Regular replenishment
353Rp 38,71523 Mar 202633 d
14 Jan 2026PR06
Regular replenishment
776Rp 35,95125 Jan 202611 d
22 Dec 2025PR06
Regular replenishment
638Rp 37,58119 Jan 202628 d
11 Nov 2025PR01
Import / long-lead
624Rp 37,82319 Jan 202669 d
28 Oct 2025PR03
Regular replenishment
334Rp 37,98625 Dec 202558 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Feb 2027PX_PP-376APump overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
28 Sept 2026LowPX_KC-886DKC-886D high vibration
26 Sept 2026MediumPX_KC-365CKC-365C lube oil filter DP high
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
23 Sept 2026MediumPX_HE-1483AHE-1483A fouling
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A

Recent goods issues

Posting dateQtyOrderOrder type
19 Sept 20264201000020402Corrective
09 Aug 202616201000001982Corrective
25 Jul 202616201000021629Corrective
22 Jul 202612201000024568Corrective
11 Jul 20264201000017592Corrective
03 Jul 202632201000027253Corrective
11 Jun 202624201000031705Corrective
10 Jun 202696201000026975Corrective
19 May 20268201000006651Corrective
14 May 2026288209000009186Other maintenance
10 Apr 202696201000014233Corrective
26 Feb 202696201000000733Corrective
01 Feb 202612201000015284Corrective
30 Jan 20268201000001739Corrective
30 Jan 2026144203000033471Turnaround