Sparely
DU

STUDBOLT,3/4INX40MM,B7/2H

Material 4100024258 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024258
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (32 of 45 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
27 d · P80 39 d
Unit price
Rp 18,102

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 897 EA/year: 897 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~27 days; expected demand during lead time 66.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 250, order up to 1,113.
  • 5.Installed on 45 FuncLoc(s), 32 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 336Single sourceAbnormal consumptionOpen PO
On hand / on order
416 / 257
next delivery 03 Oct 2026
Today Min / Max
314 / 591
static parameters in BoM
Rec. Min (reorder point)
250
safety stock 184
Rec. Max
1,113
order qty 863
Service level
99.9%
stockout risk now 0%
Unit price
Rp 18,102
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 13 issue days in the last 180 days, last issue 10 days ago, 60 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (480 units) excluded from the baseline.

Demand pattern Erratic · 30 issue days · 9 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 45 functional locations

32 with criticality A/B · 576 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A1211442.86
PX_BF-112
CRACKING FURNACE BF-112
A247327.01
PX_BF-103
CRACKING FURNACE BF-103
A163814.58
PX_HE-1500B
SEAL OIL CONDENSER
A1273.22
PX_KT-856A
TURBINE FOR KC-856A
A472.81
PX_KT-419A
TURBINE FOR KC-419A
A2462.81
PX_KC-479C
DILUTION STEAM COMPRESSOR
A2052.71
PX_KT-397A
TURBINE FOR KC-397A
A852.81
PX_PCV-1960
PRESSURE CONTROL VALVE
A840.94
PX_HE-1393C
QUENCH WATER PREHEATER
A1631.08
PX_CL-398
C3 RECYCLE TOWER
A420.38
PX_KC-801
DEMIN WATER FAN
A821.43

Lead time and procurement

Lead time 27 ± 16 days (PO history, 13 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
19 Aug 2026PR06
Regular replenishment
294Rp 18,12408 Sept 202620 d
29 Jul 2026PR06
Regular replenishment
768Rp 17,81920 Aug 202622 d
26 Jul 2026PR03
Regular replenishment
257Rp 17,57803 Oct 2026
open
69 d
10 Jun 2026PR03
Regular replenishment
808Rp 18,37021 Jun 202611 d
31 May 2026PR03
Regular replenishment
762Rp 17,55808 Jul 202638 d
10 Apr 2026PR06
Regular replenishment
285Rp 18,47310 May 202630 d
20 Mar 2026PR06
Regular replenishment
421Rp 18,44801 Apr 202612 d
18 Mar 2026PR06
Regular replenishment
835Rp 17,60208 Apr 202621 d
01 Dec 2025PR03
Regular replenishment
583Rp 17,44224 Dec 202523 d
23 Sept 2025PR03
Regular replenishment
645Rp 18,10213 Oct 202520 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026MediumPX_HE-771ARetubing HE-771A
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
19 Sept 2026LowPX_BF-103Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20268201000019618Corrective
22 Aug 202624201000006257Corrective
21 Aug 20268201000013554Corrective
30 Jul 202632201000026316Corrective
26 Jul 20268201000005472Corrective
13 Jul 202616201000029732Corrective
07 Jul 20268201000030618Corrective
25 Jun 20268201000021992Corrective
24 Jun 20268201000016931Corrective
03 Jun 202648201000037251Corrective
20 May 202696201000006755Corrective
22 Apr 202612201000020310Corrective
12 Apr 20264201000013543Corrective
15 Mar 202612201000018051Corrective
27 Feb 202624201000027179Corrective