STUDBOLT,1/2INX95MM,B16/4

Material 4100024279 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024279
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (22 of 33 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
19 d · P80 20 d
Unit price
Rp 26,321

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 590 EA/year: 582 unplanned (recency-weighted compound poisson (own history)) + 8.6 from the maintenance plan.
  • 3.Lead time ~19 days; expected demand during lead time 31.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 161, order up to 742.
  • 5.Installed on 33 FuncLoc(s), 22 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 384Single sourceAbnormal consumptionOpen PO
On hand / on order
449 / 399
next delivery 07 Oct 2026
Today Min / Max
195 / 514
static parameters in BoM
Rec. Min (reorder point)
161
safety stock 131
Rec. Max
742
order qty 581
Service level
100.0%
stockout risk now 0%
Unit price
Rp 26,321
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 13 days ago, 35 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (408 units) excluded from the baseline.

Demand pattern Erratic · 39 issue days · 8 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 33 functional locations

22 with criticality A/B · 428 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A811442.86
PX_BF-104
CRACKING FURNACE BF-104
A122811.58
PX_KC-713B
SPENT CAUSTIC FAN
A1263.14
PX_KC-479C
DILUTION STEAM COMPRESSOR
A1252.71
PX_KC-235D
DEMIN WATER FAN
A421.00
PX_CL-658
RICH AMINE STRIPPER
A2010.38
PX_HE-949A
SEAL OIL PREHEATER
A1210.65
PX_PCV-1652
BY PASS DUCT
A2010.51
PX_1-FG-6793-B22A-C
PIPE-1 FROM CL-640 TO PP-506A
A800.01
PX_CL-933
SEAL OIL STRIPPER
A400.38
PX_HE-1797C
FUEL OIL PREHEATER
A1600.22
PX_HE-397
SEAL OIL COOLER
A800.22

Lead time and procurement

Lead time 19 ± 10 days (PO history, 17 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
19 Sept 2026PR06
Regular replenishment
399Rp 27,13807 Oct 2026
open
18 d
29 Jun 2026PR03
Regular replenishment
725Rp 27,09527 Jul 202628 d
10 Jun 2026PR03
Regular replenishment
794Rp 27,39715 Jul 202635 d
07 May 2026PR03
Regular replenishment
575Rp 25,45116 May 20269 d
23 Apr 2026PR06
Regular replenishment
651Rp 26,32108 May 202615 d
28 Feb 2026PR03
Regular replenishment
686Rp 27,43412 Mar 202612 d
20 Feb 2026PR03
Regular replenishment
685Rp 25,45010 Mar 202618 d
19 Jan 2026PR03
Regular replenishment
944Rp 26,81006 Feb 202618 d
14 Jan 2026PR03
Regular replenishment
872Rp 27,31429 Jan 202615 d
28 Dec 2025PR06
Regular replenishment
389Rp 26,62113 Jan 202616 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul2.86
26 Dec 2026PX_KT-264ATurbine major overhaul5.73

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
26 Sept 2026MediumPX_KC-365CKC-365C lube oil filter DP high
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
10 Sept 2026MediumPX_KC-479CKC-479C bearing temp high

Recent goods issues

Posting dateQtyOrderOrder type
26 Sept 202624203000034378Turnaround
18 Sept 202696201000020281Corrective
09 Aug 20268201000030506Corrective
11 Jul 202624201000016199Corrective
06 May 202648201000011178Corrective
23 Apr 202696201000030658Corrective
16 Apr 202612201000007152Corrective
03 Apr 202632201000004104Corrective
03 Apr 20264201000004104Corrective
03 Apr 202696201000004104Corrective
02 Mar 202696201000003936Corrective
21 Feb 20268201000037651Corrective
20 Jan 202612201000026873Corrective
20 Jan 202632201000028513Corrective
16 Jan 202648201000014196Corrective