Sparely
DU

STUDBOLT,1/2INX45MM,B7/2H

Material 4100024320 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024320
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (20 of 30 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
GEMILANG MANDIRI INTERNASIONAL PT
Lead time
25 d · P80 40 d
Unit price
Rp 64,835

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 409 EA/year: 389 unplanned (recency-weighted compound poisson (own history)) + 20 from the maintenance plan.
  • 3.Lead time ~25 days; expected demand during lead time 27.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 134, order up to 442.
  • 5.Installed on 30 FuncLoc(s), 20 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 144Single sourceAbnormal consumptionOpen PO
On hand / on order
156 / 448
next delivery 17 Oct 2026
Today Min / Max
34 / 96
static parameters in BoM
Rec. Min (reorder point)
134
safety stock 108
Rec. Max
442
order qty 308
Service level
99.9%
stockout risk now 0%
Unit price
Rp 64,835
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 63 days ago, 12 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 7 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (144 units) excluded from the baseline.

Demand pattern Lumpy · 21 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 30 functional locations

20 with criticality A/B · 384 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-107
CRACKING FURNACE BF-107
A4239.01
PX_HE-1483A
C4 PRODUCT COOLER
A4113.22
PX_FCV-621
PP-902B OUTLET FLOW
A441.39
PX_CL-859
FLUSHING OIL SCRUBBER
A1620.81
PX_KC-663A
CONDENSATE FAN
A1610.57
PX_PP-882A
CONDENSATE PUMP
A410.62
PX_FCV-1224
BY PASS LINE
A2400.11
PX_HE-1842D
FUEL OIL COOLER
A1600.22
PX_KC-930C
SLOP OIL FAN
A1200.57
PX_KT-308B
TURBINE FOR KC-308B
A1601.10
PX_PRV-913
SAFETY VALVE HE-1593C
A2400.04
PY_CL-454
C3 RECYCLE TOWER
A400.38

Lead time and procurement

Lead time 25 ± 18 days (PO history, 11 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
24 Aug 2026PR03
Regular replenishment
448Rp 64,61017 Oct 2026
open
54 d
15 Aug 2026PR03
Regular replenishment
267Rp 64,37724 Aug 20269 d
17 Jul 2026PR05
Project / turnaround
203Rp 65,64608 Aug 202622 d
19 May 2026PR03
Regular replenishment
371Rp 63,33913 Jun 202625 d
20 Apr 2026PR03
Regular replenishment
443Rp 65,08719 Jun 202660 d
14 Apr 2026PR06
Regular replenishment
146Rp 62,53003 May 202619 d
06 Apr 2026PR05
Project / turnaround
272Rp 62,18116 May 202640 d
07 Feb 2026PR03
Regular replenishment
220Rp 65,04314 Feb 20267 d
19 Jan 2026PR06
Regular replenishment
244Rp 65,85705 Feb 202617 d
21 Oct 2025PR06
Regular replenishment
447Rp 64,83528 Oct 20257 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
17 Dec 2026PX_FCV-1447Final Element Overhaul; CV2.86
01 Feb 2027PX_FCV-1932Final Element Overhaul; Control Valve17.2

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
23 Sept 2026MediumPX_HE-1483AHE-1483A fouling
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
21 Aug 2026LowPX_HE-1483AReplace lamp as per PM finding
19 Aug 2026MediumPX_FCV-1447FCV-1447; IA leak from regulator
15 Aug 2026MediumPX_BF-107Hot spot at convection BF-107
08 Aug 2026LowPX_BF-107Cleaning burner BF-107
21 Jul 2026MediumPX_BF-107Replace lamp as per PM finding
21 Jul 2026MediumPX_BF-107Thermograph wall BF-107

Recent goods issues

Posting dateQtyOrderOrder type
30 Jul 202648204000020866Preventive
03 Jul 202696201000000805Corrective
31 May 202624201000020779Corrective
24 Mar 202648201000010975Corrective
20 Feb 20268201000028494Corrective
18 Jan 20268201000011434Corrective
04 Jan 202612201000021786Corrective
03 Jan 20268201000003974Corrective
02 Jan 202632201000037004Corrective
17 Dec 202516201000028633Corrective
14 Dec 202548201000029280Corrective
13 Dec 202524201000007088Corrective
12 Dec 20254204000022083Preventive
03 Dec 202512201000024707Corrective
29 Nov 20258201000008592Corrective