STUDBOLT,5/8INX30MM,B16/4
Material 4100024362 · STUDBOLT · Plant 1000
ASafety-criticalReduceExcess
- Material
- 4100024362
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (13 of 27 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- ANUGRAH SARANA JAYA PT
- Lead time
- 28 d · P80 42 d
- Unit price
- Rp 24,282
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 336 EA/year: 322 unplanned (recency-weighted compound poisson (own history)) + 14 from the maintenance plan.
- 3.Lead time ~28 days; expected demand during lead time 25.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 122, order up to 459.
- 5.Stock 571 exceeds the level to keep (459) by 112.
- 6.Installed on 27 FuncLoc(s), 13 of them criticality A/B.
- 7.ML early warning: 96% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 24Single sourceAbnormal consumption
On hand / on order
571 / 0
no open PO
Today Min / Max
188 / 503
static parameters in BoM
Rec. Min (reorder point)
122
safety stock 98
Rec. Max
459
order qty 337
Service level
99.9%
stockout risk now 0%
Unit price
Rp 24,282
PO history
ML early warning: 96% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 9 days ago, 22 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (336 units) excluded from the baseline.
Demand pattern Lumpy · 18 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 27 functional locations
13 with criticality A/B · 372 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-107 CRACKING FURNACE BF-107 | A | 4 | 23 | 9.01 |
| PX_CL-961 LEAN AMINE COLUMN | A | 24 | 3 | 1.23 |
| PX_HE-1975 HYDROGEN COOLER | A | 8 | 3 | 1.50 |
| PX_KC-396 WASH WATER BLOWER | A | 12 | 3 | 1.43 |
| PX_HE-492C CONDENSATE TLE | A | 24 | 1 | 0.22 |
| PX_PP-1766A ETHYLENE PUMP | A | 4 | 1 | 0.19 |
| PX_HE-694C LEAN AMINE CONDENSER | B | 8 | 2 | 0.65 |
| PX_PP-1253B LUBE OIL PUMP | B | 4 | 2 | 0.62 |
| PX_HE-1647D BOTTOM COOLER | B | 4 | 0 | 0.22 |
| PX_HE-526A COOLING WATER REBOILER | B | 16 | 0 | 0.22 |
| PX_PRV-248 SAFETY VALVE VD-1282 | B | 8 | 0 | 0.04 |
| PX_VD-1525B SEAL OIL SURGE DRUM | B | 4 | 0 | 0.08 |
Lead time and procurement
Lead time 28 ± 13 days (PO history, 9 PO lines) · on-time 60%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Jun 2026 | PR03 Regular replenishment | 384 | Rp 23,917 | 01 Aug 2026 | 34 d |
| 15 Jun 2026 | PR03 Regular replenishment | 389 | Rp 23,987 | 22 Jul 2026 | 37 d |
| 24 Feb 2026 | PR06 Regular replenishment | 377 | Rp 25,119 | 14 Apr 2026 | 49 d |
| 31 Jan 2026 | PR03 Regular replenishment | 273 | Rp 23,937 | 22 Feb 2026 | 22 d |
| 17 Dec 2025 | PR03 Regular replenishment | 209 | Rp 24,699 | 05 Jan 2026 | 19 d |
| 13 Nov 2025 | PR03 Regular replenishment | 253 | Rp 25,195 | 01 Jan 2026 | 49 d |
| 29 Jul 2025 | PR06 Regular replenishment | 309 | Rp 24,929 | 15 Aug 2025 | 17 d |
| 09 Jul 2025 | PR03 Regular replenishment | 152 | Rp 24,106 | 02 Aug 2025 | 24 d |
| 04 Jul 2025 | PR03 Regular replenishment | 295 | Rp 24,457 | 23 Jul 2025 | 19 d |
| 22 May 2025 | PR03 Regular replenishment | 209 | Rp 23,908 | 20 Apr 2025 | 1 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_TCV-1082A | Final Element Overhaul; Control Valve | 14.3 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
| 11 Sept 2026 | Medium | PX_CL-961 | [MSI-B-26-UAX-291] Permanent repair |
| 08 Sept 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 03 Sept 2026 | Low | PX_BF-110 | Hot spot at convection BF-110 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Sept 2026 | 12 | 201000037585 | Corrective |
| 08 Sept 2026 | 8 | 201000002044 | Corrective |
| 24 Jun 2026 | 36 | 209000014083 | Other maintenance |
| 16 Jun 2026 | 16 | 201000018563 | Corrective |
| 11 May 2026 | 16 | 201000016405 | Corrective |
| 05 Apr 2026 | 4 | 205000036120 | Other maintenance |
| 14 Mar 2026 | 8 | 201000021409 | Corrective |
| 30 Jan 2026 | 96 | 201000025995 | Corrective |
| 14 Jan 2026 | 24 | 201000020496 | Corrective |
| 13 Jan 2026 | 32 | 201000020496 | Corrective |
| 29 Dec 2025 | 24 | 203000006078 | Turnaround |
| 25 Dec 2025 | 24 | 201000034498 | Corrective |
| 25 Dec 2025 | 48 | 201000037770 | Corrective |
| 15 Dec 2025 | 96 | 201000022685 | Corrective |
| 25 Nov 2025 | 48 | 201000018405 | Corrective |