Sparely
DU

STUDBOLT,1/2INX105MM,B16/4

Material 4100024393 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024393
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 17 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 215 EA/year: 210 unplanned (recency-weighted compound poisson (own history)) + 5.7 from the maintenance plan.
  • 3.Lead time ~23 days; expected demand during lead time 13.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 80, order up to 296.
  • 5.Installed on 17 FuncLoc(s), 8 of them criticality A/B.
  • 6.ML early warning: 77% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 96Abnormal consumptionPrice estimatedLead time estimated
On hand / on order
135 / 0
no open PO
Today Min / Max
36 / 69
static parameters in BoM
Rec. Min (reorder point)
80
safety stock 67
Rec. Max
296
order qty 216
Service level
99.9%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 77% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 6 days ago, 17 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (96 units) excluded from the baseline.

Demand pattern Lumpy · 12 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 17 functional locations

8 with criticality A/B · 228 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A47327.01
PX_BF-111
CRACKING FURNACE BF-111
A24239.01
PX_HE-278D
COOLING WATER TLE
A1693.65
PX_KT-419A
TURBINE FOR KC-419A
A1662.81
PX_HE-534C
SEAL OIL TLE
A2430.65
PX_HE-1917B
DILUTION STEAM TLE
A1221.08
PX_PCV-1274
PRESSURE CONTROL VALVE
A810.08
PX_HE-605
WASH WATER EXCHANGER
A1200.22
PY_HE-236B
SEAL OIL CONDENSER
C2051.50
PX_LCV-1986
LEVEL CONTROL VALVE
C441.40
PX_3/4-LS-10065-A22A-H
PIPE-3/4 FROM HE-1547 TO VD-999
C1600.01
PX_3/4-MS-21287-A41A
PIPE-3/4 FROM VD-1292 TO HE-256
C800.01

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_PCV-1274Final Element Overhaul; Control Valve5.73

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
16 Sept 2026MediumPX_HE-278DRetubing HE-278D
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112

Recent goods issues

Posting dateQtyOrderOrder type
25 Sept 202632201000013974Corrective
13 Jun 20268201000023717Corrective
08 Jun 20268201000003390Corrective
08 May 20264201000028932Corrective
20 Mar 202632201000005983Corrective
06 Mar 202616201000004574Corrective
15 Feb 20268201000037652Corrective
18 Jan 202648201000015987Corrective
28 Dec 202548203000006078Turnaround
08 Dec 202516201000003397Corrective
12 Nov 202524203000036873Turnaround
12 Nov 202524203000039046Turnaround
21 Aug 2025144209000035421Other maintenance
14 Jul 202512209000033701Other maintenance
04 Jul 202512201000006157Corrective