STUDBOLT,5/8INX115MM,B7/2H

Material 4100024419 · STUDBOLT · Plant 1000

ASafety-criticalReduceExcess
Material
4100024419
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (11 of 25 FuncLocs A/B, 5 safety/shutdown valve)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
26 d · P80 31 d
Unit price
Rp 114,400

Recommendation

  • 1.Safety-critical element: installed on 5 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 168 EA/year: 168 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~26 days; expected demand during lead time 12.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 70, order up to 219.
  • 5.Stock 1,869 exceeds the level to keep (219) by 1,650.
  • 6.Installed on 25 FuncLoc(s), 11 of them criticality A/B.
  • 7.ML early warning: 82% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningSingle sourceAbnormal consumption
On hand / on order
1,869 / 0
no open PO
Today Min / Max
34 / 65
static parameters in BoM
Rec. Min (reorder point)
70
safety stock 59
Rec. Max
219
order qty 149
Service level
99.9%
stockout risk now 0%
Unit price
Rp 114,400
PO history
ML early warning: 82% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 22 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 19 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 25 functional locations

11 with criticality A/B · 280 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1890
BFW PUMP
A451.47
PX_KC-447
LUBE OIL COMPRESSOR
A1641.85
PX_FCV-645
CONTROL VALVE
A810.11
PX_KC-397A
DILUTION STEAM FAN
A2010.57
PX_PCV-1709B
BY PASS DUCT
A2010.08
PX_KC-624A
RECYCLE ETHANE BLOWER
B852.28
PX_HE-1900C
SEAL OIL PREHEATER
B2030.65
PX_PRV-153
SAFETY VALVE HE-1368C
B810.47
PX_HE-731B
RECYCLE ETHANE CONDENSER
B2400.22
PX_PCV-499
BY PASS DUCT
B400.08
PX_VD-1291
C4 PRODUCT DRUM
B1600.08
PX_PRV-318
SAFETY VALVE HE-388A
C1220.90

Lead time and procurement

Lead time 26 ± 10 days (PO history, 7 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
04 Sept 2026PR03
Regular replenishment
92Rp 118,26129 Sept 202625 d
25 Jun 2026PR03
Regular replenishment
207Rp 116,53424 Jul 202629 d
13 Jun 2026PR04
Regular (other)
252Rp 110,21103 Jul 202620 d
17 May 2026PR06
Regular replenishment
187Rp 108,69125 Jun 202639 d
01 Sept 2025PR03
Regular replenishment
87Rp 114,40030 Sept 202529 d
12 Aug 2025PR03
Regular replenishment
204Rp 117,28628 Aug 202516 d
05 May 2025PR06
Regular replenishment
80Rp 110,60106 Jun 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026MediumPX_PP-1890PP-1890 discharge pressure low
21 Aug 2026MediumPX_KC-624AKC-624A high vibration
17 Aug 2026MediumPX_KC-447Leak from packing
10 Aug 2026MediumPX_KC-624ALeak from packing
03 Aug 2026LowPX_PP-1890Painting PP-1890
07 Jul 2026MediumPX_KC-447Replace lamp as per PM finding
26 Jun 2026MediumPY_HE-418Repair insulation HE-418
18 Jun 2026LowPX_KC-624AOverhaul
23 Mar 2026EmergencyPX_PP-1890Leak from packing
04 Mar 2026MediumPX_PRV-318Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
09 Sept 20268201000027353Corrective
18 May 20268201000006651Corrective
24 Mar 20264201000019498Corrective
24 Feb 20268201000024861Corrective
29 Jan 202612201000035426Corrective
28 Jan 202616201000036335Corrective
22 Jan 20268201000012637Corrective
09 Jan 20268201000016973Corrective
25 Nov 202548201000004694Corrective
24 Nov 202532201000017774Corrective
26 Oct 20258201000010024Corrective
21 Oct 202524201000012121Corrective
29 Aug 202512201000002071Corrective
29 Aug 202596201000032106Corrective
02 Aug 202596201000018941Corrective