STUDBOLT,7/8INX65MM,B7/2H
Material 4100024443 · STUDBOLT · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100024443
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (11 of 23 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- SURYA PERKASA GLOBAL PT
- Lead time
- 38 d · P80 47 d
- Unit price
- Rp 9,054
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 194 EA/year: 194 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~38 days; expected demand during lead time 20.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 86, order up to 280.
- 5.Installed on 23 FuncLoc(s), 11 of them criticality A/B.
- 6.ML early warning: 97% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 120Single sourceAbnormal consumptionOpen PO
On hand / on order
73 / 89
next delivery 25 Oct 2026
Today Min / Max
52 / 81
static parameters in BoM
Rec. Min (reorder point)
86
safety stock 67
Rec. Max
280
order qty 194
Service level
99.9%
stockout risk now 0%
Unit price
Rp 9,054
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 3 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (156 units) excluded from the baseline.
Demand pattern Erratic · 18 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 23 functional locations
11 with criticality A/B · 324 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 4 | 7 | 2.81 |
| PX_HE-1768 GASOLINE EXCHANGER | A | 20 | 1 | 0.65 |
| PX_KC-527 METHANOL BLOWER | A | 16 | 0 | 0.57 |
| PX_KT-308B TURBINE FOR KC-308B | A | 8 | 0 | 1.10 |
| PX_PP-1977 FLUSHING OIL PUMP | A | 16 | 0 | 0.19 |
| PX_PP-583B WASH WATER PUMP | A | 12 | 0 | 0.19 |
| PX_PP-697A QUENCH OIL PUMP | A | 8 | 0 | 0.19 |
| PY_VD-157B GASOLINE KO DRUM | A | 8 | 0 | 0.08 |
| PX_HE-456 BFW EXCHANGER | B | 16 | 3 | 1.08 |
| PX_HE-1003D C4 PRODUCT COOLER | B | 20 | 1 | 0.22 |
| PX_LCV-896A LEVEL CONTROL VALVE | B | 20 | 0 | 0.12 |
| PX_3-FG-4642-A22A-H PIPE-3 FROM PP-563 TO VD-468 | C | 12 | 1 | 0.01 |
Lead time and procurement
Lead time 38 ± 12 days (PO history, 6 PO lines) · on-time 49%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Sept 2026 | PR03 Regular replenishment | 89 | Rp 8,852 | 25 Oct 2026 open | 47 d |
| 18 Jun 2026 | PR04 Regular (other) | 157 | Rp 9,023 | 21 Jul 2026 | 33 d |
| 06 May 2026 | PR03 Regular replenishment | 70 | Rp 9,085 | 07 Jul 2026 | 62 d |
| 30 Jan 2026 | PR03 Regular replenishment | 189 | Rp 9,185 | 14 Mar 2026 | 43 d |
| 06 Aug 2025 | PR03 Regular replenishment | 127 | Rp 8,921 | 21 Sept 2025 | 46 d |
| 02 Jul 2025 | PR03 Regular replenishment | 178 | Rp 9,328 | 09 Aug 2025 | 38 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 08 Jul 2026 | Medium | PX_KC-422A | KC-422A high vibration |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 26 May 2026 | Medium | PX_HE-456 | Install scaffolding at HE-456 |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 03 Mar 2026 | Low | PX_KC-422A | Leak from packing |
| 20 Jan 2026 | Low | PX_KC-422A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Sept 2026 | 16 | 201000014541 | Corrective |
| 31 Aug 2026 | 24 | 201000017833 | Corrective |
| 13 Aug 2026 | 4 | 201000018816 | Corrective |
| 16 Jul 2026 | 8 | 201000019779 | Corrective |
| 10 Jun 2026 | 144 | 209000014321 | Other maintenance |
| 06 May 2026 | 4 | 204000003804 | Preventive |
| 06 Apr 2026 | 8 | 201000039783 | Corrective |
| 09 Mar 2026 | 4 | 201000003266 | Corrective |
| 21 Feb 2026 | 8 | 201000016647 | Corrective |
| 17 Feb 2026 | 8 | 201000026224 | Corrective |
| 29 Jan 2026 | 8 | 201000038343 | Corrective |
| 27 Jan 2026 | 32 | 201000020363 | Corrective |
| 25 Dec 2025 | 24 | 203000006078 | Turnaround |
| 23 Dec 2025 | 24 | 201000016961 | Corrective |
| 16 Dec 2025 | 96 | 203000027801 | Turnaround |