STUDBOLT,1/2INX85MM,B16/4
Material 4100024473 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100024473
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (13 of 22 FuncLocs A/B, 4 safety/shutdown valve)
- Supplier
- PRIMA INDUSTRI MAKMUR PT
- Lead time
- 21 d · P80 22 d
- Unit price
- Rp 66,613
Recommendation
- 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 148 EA/year: 136 unplanned (recency-weighted compound poisson (own history)) + 11 from the maintenance plan.
- 3.Lead time ~21 days; expected demand during lead time 16 (incl. 8.6 planned).
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 63, order up to 211.
- 5.On hand 23 + on order 0 is at or below the reorder point: order 188 now.
- 6.Installed on 22 FuncLoc(s), 13 of them criticality A/B.
- 7.ML early warning: 83% probability of demand in the next 90 days.
Proposed purchase requisition
188 EA
Rp 12.5M · order by 01 Oct 2026
Expected arrival ≈ 21 days
Safety-critical (SCE)ML early warningLast turnaround used 12Single sourceAbnormal consumptionPlanned demand in lead time
On hand / on order
23 / 0
no open PO
Today Min / Max
13 / 23
static parameters in BoM
Rec. Min (reorder point)
63
safety stock 47
Rec. Max
211
order qty 148
Service level
100.0%
stockout risk now 11%
Unit price
Rp 66,613
PO history
ML early warning: 83% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 122 days ago, 26 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (12 units) excluded from the baseline.
Demand pattern Lumpy · 12 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 22 functional locations
13 with criticality A/B · 340 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 24 | 82 | 30.86 |
| PX_CL-658 RICH AMINE STRIPPER | A | 24 | 1 | 0.38 |
| PX_HE-535C FUEL OIL COOLER | A | 16 | 1 | 0.22 |
| PX_CL-1833 CHARGE GAS COLUMN | A | 24 | 0 | 0.38 |
| PX_HE-439C LUBE OIL REBOILER | A | 24 | 0 | 0.22 |
| PX_HE-395B FLUSHING OIL COOLER | B | 8 | 2 | 1.08 |
| PX_HE-1287D CHARGE GAS CONDENSER | B | 16 | 1 | 0.22 |
| PX_VD-1417C FLUSHING OIL ACCUMULATOR | B | 12 | 1 | 0.08 |
| PX_HE-391 CHARGE GAS TLE | B | 16 | 0 | 0.22 |
| PX_PRV-1101 SAFETY VALVE HE-322C | B | 24 | 0 | 0.04 |
| PX_PRV-114A SAFETY VALVE HE-1459D | B | 20 | 0 | 0.04 |
| PX_TCV-1241A CL-1475 TEMP CONTROL | B | 16 | 0 | 0.12 |
Lead time and procurement
Lead time 21 ± 11 days (PO history, 6 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jul 2026 | PR03 Regular replenishment | 33 | Rp 67,052 | 28 Jul 2026 | 12 d |
| 17 May 2026 | PR06 Regular replenishment | 32 | Rp 69,522 | 23 Jun 2026 | 37 d |
| 17 Mar 2026 | PR03 Regular replenishment | 66 | Rp 66,388 | 31 Mar 2026 | 14 d |
| 09 Sept 2025 | PR03 Regular replenishment | 82 | Rp 66,838 | 01 Oct 2025 | 22 d |
| 15 Aug 2025 | PR06 Regular replenishment | 54 | Rp 63,827 | 29 Aug 2025 | 14 d |
| 03 Jul 2025 | PR03 Regular replenishment | 72 | Rp 65,161 | 22 Jul 2025 | 19 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PY_PP-1584B | Pump overhaul | 8.59 |
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 24 Sept 2026 | Low | PX_KC-879A | Inspect coupling KC-879A |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Jun 2026 | 4 | 201000010191 | Corrective |
| 26 May 2026 | 12 | 201000010896 | Corrective |
| 26 Apr 2026 | 8 | 201000039303 | Corrective |
| 11 Mar 2026 | 16 | 201000003266 | Corrective |
| 08 Mar 2026 | 24 | 201000018039 | Corrective |
| 24 Feb 2026 | 8 | 201000026503 | Corrective |
| 15 Feb 2026 | 8 | 201000039471 | Corrective |
| 23 Jan 2026 | 96 | 201000022788 | Corrective |
| 31 Dec 2025 | 24 | 201000020705 | Corrective |
| 31 Dec 2025 | 4 | 201000028354 | Corrective |
| 18 Dec 2025 | 8 | 201000007395 | Corrective |
| 14 Nov 2025 | 12 | 203000023445 | Turnaround |
| 01 Oct 2025 | 12 | 201000029670 | Corrective |
| 25 Aug 2025 | 4 | 201000008755 | Corrective |