STUDBOLT,1INX70MM,B8M/8M
Material 4100024501 · STUDBOLT · Plant 1000
ASafety-criticalReorderCriticalBelow reorder point
- Material
- 4100024501
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 12 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 36 d · P80 60 d
- Unit price
- Rp 28,573
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 123 EA/year: 115 unplanned (recency-weighted compound poisson (own history)) + 8.6 from the maintenance plan.
- 3.Lead time ~36 days; expected demand during lead time 11.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 71, order up to 195.
- 5.On hand 4 + on order 0 is at or below the reorder point: order 191 now.
- 6.Installed on 12 FuncLoc(s), 8 of them criticality A/B.
- 7.ML early warning: 80% probability of demand in the next 90 days.
Proposed purchase requisition
191 EA
Rp 5.5M · order by 01 Oct 2026
Expected arrival ≈ 36 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
71
safety stock 60
Rec. Max
195
order qty 124
Service level
99.9%
stockout risk now 47%
Unit price
Rp 28,573
PO history
ML early warning: 80% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 22 days ago, 7 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 7 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 12 functional locations
8 with criticality A/B · 216 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-910 QUENCH OIL SCRUBBER | A | 24 | 4 | 1.23 |
| PX_TCV-1256 PP-1570A TEMP CONTROL | A | 24 | 4 | 1.40 |
| PX_PP-1575A METHANE PUMP | A | 20 | 1 | 0.19 |
| PY_PRV-1171 SAFETY VALVE VD-1192 | A | 20 | 0 | 0.04 |
| PX_HE-981 SEAL OIL COOLER | B | 24 | 8 | 2.79 |
| PX_HE-224C GASOLINE REBOILER | B | 8 | 1 | 0.22 |
| PX_LCV-896A LEVEL CONTROL VALVE | B | 8 | 0 | 0.12 |
| PX_PP-1751A BFW PUMP | B | 20 | 0 | 0.19 |
| PX_HE-1061B SPENT CAUSTIC TLE | C | 16 | 3 | 0.65 |
| PX_3/4-QO-14541-B21A-C PIPE-3/4 FROM HE-251C TO PP-584A | C | 24 | 0 | 0.01 |
| PX_KT-383A TURBINE FOR KC-383A | S | 16 | 7 | 3.67 |
| PX_KT-264A TURBINE FOR KC-264A | S | 12 | 4 | 2.39 |
Lead time and procurement
Lead time 36 ± 17 days (PO history, 4 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 May 2026 | PR03 Regular replenishment | 26 | Rp 29,568 | 13 Jun 2026 | 39 d |
| 28 Dec 2025 | PR04 Regular (other) | 51 | Rp 28,107 | 20 Feb 2026 | 54 d |
| 01 Nov 2025 | PR06 Regular replenishment | 20 | Rp 28,477 | 25 Nov 2025 | 24 d |
| 23 Aug 2025 | PR03 Regular replenishment | 17 | Rp 28,668 | 30 Oct 2025 | 68 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 8.59 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 21 Aug 2026 | Medium | PX_CL-910 | Inspect CL-910 internal |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 12 Aug 2026 | Medium | PX_HE-981 | Install scaffolding at HE-981 |
| 30 Jul 2026 | Low | PX_TCV-1256 | TCV-1256; IA leak from regulator |
| 29 Jul 2026 | Medium | PX_TCV-1256 | Overhaul TCV-1256 |
| 26 Jun 2026 | Medium | PX_HE-981 | Retubing HE-981 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Sept 2026 | 12 | 201000030902 | Corrective |
| 03 Sept 2026 | 32 | 201000019996 | Corrective |
| 25 Jul 2026 | 8 | 201000022903 | Corrective |
| 15 May 2026 | 16 | 201000004147 | Corrective |
| 09 Mar 2026 | 48 | 201000034005 | Corrective |
| 19 Oct 2025 | 4 | 201000039957 | Corrective |
| 29 Sept 2025 | 4 | 201000005438 | Corrective |