STUDBOLT,1INX45MM,B16/4

Material 4100024534 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100024534
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (14 of 19 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
23 d · P80 29 d
Unit price
Rp 95,608

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 249 EA/year: 240 unplanned (recency-weighted compound poisson (own history)) + 8.6 from the maintenance plan.
  • 3.Lead time ~23 days; expected demand during lead time 15.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 84, order up to 282.
  • 5.On hand 48 + on order 0 is at or below the reorder point: order 234 now.
  • 6.Installed on 19 FuncLoc(s), 14 of them criticality A/B.
  • 7.ML early warning: 78% probability of demand in the next 90 days.
Proposed purchase requisition
234 EA
Rp 22.4M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)ML early warningLast turnaround used 36Single sourceAbnormal consumption
On hand / on order
48 / 0
no open PO
Today Min / Max
42 / 75
static parameters in BoM
Rec. Min (reorder point)
84
safety stock 70
Rec. Max
282
order qty 198
Service level
99.9%
stockout risk now 4%
Unit price
Rp 95,608
PO history
ML early warning: 78% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 72 days ago, 25 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (60 units) excluded from the baseline.

Demand pattern Lumpy · 17 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 19 functional locations

14 with criticality A/B · 268 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A2411442.86
PX_KT-419A
TURBINE FOR KC-419A
A1262.81
PX_KC-316D
METHANOL FAN
A2451.43
PX_KT-397A
TURBINE FOR KC-397A
A2052.81
PX_CL-1039
CHARGE GAS STRIPPER
A2420.81
PX_KC-435A
FUEL OIL AIR COMPRESSOR
A2021.00
PX_HE-322C
LEAN AMINE EXCHANGER
A800.22
PY_VD-383
QUENCH OIL SURGE DRUM
A2400.08
PX_HE-786
ETHYLENE COOLER
B2041.08
PX_HE-1164D
QUENCH WATER CONDENSER
B421.08
PX_PP-1253B
LUBE OIL PUMP
B820.62
PX_PP-1577D
ETHYLENE PUMP
B1221.05

Lead time and procurement

Lead time 23 ± 10 days (PO history, 11 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
20 Jun 2026PR03
Regular replenishment
114Rp 99,60410 Jul 202620 d
24 Mar 2026PR03
Regular replenishment
72Rp 98,18513 Apr 202620 d
14 Feb 2026PR03
Regular replenishment
186Rp 95,60804 Mar 202618 d
07 Feb 2026PR03
Regular replenishment
128Rp 92,98818 Feb 202611 d
31 Jan 2026PR03
Regular replenishment
159Rp 92,37607 Mar 202635 d
02 Nov 2025PR06
Regular replenishment
241Rp 98,36712 Nov 202510 d
16 Oct 2025PR03
Regular replenishment
187Rp 94,79314 Nov 202529 d
22 Sept 2025PR01
Import / long-lead
92Rp 91,98021 Oct 202529 d
01 Sept 2025PR05
Project / turnaround
164Rp 94,42209 Oct 202538 d
17 Jul 2025PR03
Regular replenishment
69Rp 95,74603 Aug 202517 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul8.59

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
16 Sept 2026MediumPX_HE-786Leak from packing
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
07 Sept 2026MediumPX_PP-1577DReplace bearing PP-1577D
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105

Recent goods issues

Posting dateQtyOrderOrder type
21 Jul 202632201000005856Corrective
07 May 20264201000033831Corrective
03 May 20264201000029703Corrective
27 Mar 20268201000038528Corrective
20 Mar 202624201000005983Corrective
05 Feb 202612204000036606Preventive
21 Jan 202616201000035361Corrective
08 Jan 20264201000013162Corrective
02 Jan 20268201000012050Corrective
02 Jan 202696201000030385Corrective
22 Dec 202512201000022442Corrective
12 Dec 202524203000018502Turnaround
06 Dec 202512201000033371Corrective
26 Nov 202512203000012255Turnaround
27 Oct 20258201000038647Corrective