STUDBOLT,7/8INX30MM,B7/2H

Material 4100024538 · STUDBOLT · Plant 1000

AMonitorHealthy
Material
4100024538
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 15 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
21 d · P80 28 d
Unit price
Rp 9,923

Recommendation

  • 1.Forecast 100 EA/year: 100 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 5.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 154.
  • 4.Installed on 15 FuncLoc(s), 10 of them criticality A/B.
  • 5.ML early warning: 79% probability of demand in the next 90 days.
ML early warningLast turnaround used 96Single sourceAbnormal consumption
On hand / on order
99 / 0
no open PO
Today Min / Max
86 / 122
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 49
Rec. Max
154
order qty 100
Service level
100.0%
stockout risk now 0%
Unit price
Rp 9,923
PO history
ML early warning: 79% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 63 days ago, 13 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (384 units) excluded from the baseline.

Demand pattern Lumpy · 5 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 15 functional locations

10 with criticality A/B · 228 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A82811.58
PX_KC-671D
FEED BLOWER
A1631.00
PX_KC-663A
CONDENSATE FAN
A410.57
PX_28-QO-1225-A21A-HS
PIPE->16 FROM KC-867D TO VD-1438B
A2000.01
PX_CL-933
SEAL OIL STRIPPER
A1200.38
PX_FCV-1774A
CONTROL VALVE
A2000.11
PX_HE-1747A
SEAL OIL COOLER
A400.22
PX_PCV-861B
BY PASS DUCT
A800.08
PX_KC-886D
BOTTOM FAN
B2441.43
PX_VD-957
COOLING WATER DRUM
B2400.08
PX_HE-1283C
SEAL OIL PREHEATER
C2041.50
PX_3/4-FG-20466-A51A
PIPE-3/4 FROM HE-1511A TO PP-1049
C1200.01

Lead time and procurement

Lead time 21 ± 13 days (PO history, 4 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
08 Apr 2026PR04
Regular (other)
167Rp 9,89603 May 202625 d
02 Oct 2025PR03
Regular replenishment
185Rp 9,89309 Oct 20257 d
15 Jul 2025PR03
Regular replenishment
192Rp 9,95017 Aug 202533 d
12 May 2025PR03
Regular replenishment
168Rp 10,23824 May 202512 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_KC-886DKC-886D high vibration
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing
08 Aug 2026LowPX_BF-104[MSI-B-26-MZB-191] Permanent repair
04 Aug 2026MediumPX_BF-104Thermograph wall BF-104
04 Aug 2026MediumPX_BF-104Peep door broken BF-104

Recent goods issues

Posting dateQtyOrderOrder type
30 Jul 202696201000026316Corrective
26 May 20268201000022631Corrective
16 May 202616201000002618Corrective
13 Feb 202616201000030744Corrective
25 Jan 202612201000028000Corrective
06 Jan 202696203000006950Turnaround
17 Jul 2025288203000031669Turnaround