STUDBOLT,5/8INX95MM,B8M/8M

Material 4100024564 · STUDBOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100024564
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 16 FuncLocs A/B)
Supplier
PERMATA SUPLINDO MAKMUR PT
Lead time
25 d · P80 39 d
Unit price
Rp 70,557

Recommendation

  • 1.Forecast 220 EA/year: 220 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~25 days; expected demand during lead time 15.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 105, order up to 322.
  • 4.On hand 88 + on order 0 is at or below the reorder point: order 234 now.
  • 5.Installed on 16 FuncLoc(s), 10 of them criticality A/B.
  • 6.ML early warning: 73% probability of demand in the next 90 days.
Proposed purchase requisition
234 EA
Rp 16.5M · order by 01 Oct 2026
Expected arrival ≈ 25 days
ML early warningSingle sourceAbnormal consumption
On hand / on order
88 / 0
no open PO
Today Min / Max
34 / 107
static parameters in BoM
Rec. Min (reorder point)
105
safety stock 91
Rec. Max
322
order qty 217
Service level
100.0%
stockout risk now 0%
Unit price
Rp 70,557
PO history
ML early warning: 73% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 1 days ago, 9 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 9 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 16 functional locations

10 with criticality A/B · 236 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-282B
METHANE EXCHANGER
A1251.08
PX_KC-588
CAUSTIC FAN
A421.00
PX_KT-460B
TURBINE FOR KC-460B
A2421.96
PX_PP-251C
RICH AMINE PUMP
A2021.05
PX_4-LS-7492-A21A-H
PIPE-4 FROM PP-423A TO PP-254A
A400.01
PX_HE-1108C
INHIBITOR TLE
A2000.22
PX_HE-1652D
CAUSTIC EXCHANGER
B2031.08
PX_HE-1529C
ETHYLENE COOLER
B2410.22
PX_VD-1823
DILUTION STEAM SEPARATOR
B2010.08
PX_TCV-700
TEMPERATURE CONTROL VALVE
B2000.12
PX_HE-1526
FEED TLE
C1200.22
PX_ROF-1048A
LP STEAM TO HE-1950
C2000.00

Lead time and procurement

Lead time 25 ± 15 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
16 Aug 2026PR06
Regular replenishment
46Rp 70,04917 Sept 202632 d
30 Jun 2025PR03
Regular replenishment
87Rp 71,06423 Jul 202523 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026MediumPX_KC-513KC-513 high vibration
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
07 Sept 2026MediumPX_KC-513Inspect coupling KC-513
05 Sept 2026LowPX_KC-513Inspect coupling KC-513
30 Aug 2026MediumPX_KC-513KC-513 high vibration
29 Aug 2026MediumPX_HE-1652DHE-1652D tube leak
09 Aug 2026MediumPX_HE-282BHE-282B fouling
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
12 Jul 2026MediumPX_KC-513Inspect coupling KC-513
20 Jun 2026MediumPX_KC-513KC-513 bearing temp high

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20264201000013358Corrective
26 Sept 202612201000034306Corrective
19 Sept 202624204000022416Preventive
25 Jul 202624201000029643Corrective
01 Feb 202632201000025748Corrective
09 Jan 202612201000034831Corrective
07 Nov 202532201000011936Corrective
28 Oct 202596201000017782Corrective
25 Sept 20258201000030377Corrective