STUDBOLT,3/4INX65MM,B8M/8M

Material 4100024593 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100024593
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
GEMILANG MANDIRI INTERNASIONAL PT
Lead time
34 d · P80 53 d
Unit price
Rp 15,631

Recommendation

  • 1.Forecast 213 EA/year: 213 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~34 days; expected demand during lead time 20.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 118, order up to 332.
  • 4.On hand 78 + on order 0 is at or below the reorder point: order 254 now.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 51% probability of demand in the next 90 days.
Proposed purchase requisition
254 EA
Rp 4.0M · order by 01 Oct 2026
Expected arrival ≈ 34 days
ML early warningSingle source
On hand / on order
78 / 0
no open PO
Today Min / Max
13 / 36
static parameters in BoM
Rec. Min (reorder point)
118
safety stock 99
Rec. Max
332
order qty 214
Service level
99.9%
stockout risk now 3%
Unit price
Rp 15,631
PO history
ML early warning: 51% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

4 with criticality A/B · 80 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A167327.01
PX_BF-107
CRACKING FURNACE BF-107
A20239.01
PY_VD-953B
METHANOL DRUM
A810.51
PX_PP-311C
REFLUX PUMP
B2400.19
PX_LCV-1992B
LEVEL CONTROL VALVE
C1200.12

Lead time and procurement

Lead time 34 ± 15 days (PO history, 4 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
09 Aug 2026PR06
Regular replenishment
56Rp 14,85107 Sept 202629 d
24 Jul 2026PR06
Regular replenishment
29Rp 15,81723 Aug 202630 d
07 Apr 2026PR03
Regular replenishment
51Rp 15,57906 Jun 202660 d
04 Sept 2025PR06
Regular replenishment
45Rp 15,68322 Oct 202548 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
15 Jan 202648201000025741Corrective
20 Dec 20258201000028627Corrective
21 Oct 202532201000027084Corrective