STUDBOLT,1/2INX110MM,B7/2H
Material 4100024620 · STUDBOLT · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100024620
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 13 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 24 d · P80 29 d
- Unit price
- Rp 12,447
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 373 EA/year: 373 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~24 days; expected demand during lead time 25.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 149, order up to 522.
- 5.Installed on 13 FuncLoc(s), 7 of them criticality A/B.
- 6.ML early warning: 94% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 24Single source
On hand / on order
264 / 0
no open PO
Today Min / Max
163 / 392
static parameters in BoM
Rec. Min (reorder point)
149
safety stock 125
Rec. Max
522
order qty 373
Service level
99.9%
stockout risk now 0%
Unit price
Rp 12,447
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 28 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (24 units) excluded from the baseline.
Demand pattern Lumpy · 15 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 13 functional locations
7 with criticality A/B · 176 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-1256 PP-1570A TEMP CONTROL | A | 12 | 4 | 1.40 |
| PX_KT-513 TURBINE FOR KC-513 | A | 8 | 2 | 1.53 |
| PX_PP-1121 DILUTION STEAM PUMP | A | 24 | 2 | 0.62 |
| PX_HE-931B ETHYLENE CONDENSER | A | 8 | 0 | 0.22 |
| PX_PP-246C METHANOL PUMP | A | 16 | 0 | 0.19 |
| PX_FCV-1963B BY PASS LINE | B | 16 | 0 | 0.11 |
| PX_PRV-982 SAFETY VALVE VD-671A | B | 24 | 0 | 0.04 |
| PX_PCV-1300 BY PASS DUCT | C | 20 | 1 | 0.08 |
| PX_HE-1344 C3 RECYCLE TLE | C | 4 | 0 | 0.22 |
| PX_LCV-880A HE-1919A LEVEL CONTROL | C | 12 | 0 | 0.12 |
| PX_PCV-230 HE-729B PRESSURE CONTROL | C | 8 | 0 | 0.08 |
| PX_PP-376 DILUTION STEAM PUMP | C | 12 | 0 | 0.19 |
Lead time and procurement
Lead time 24 ± 10 days (PO history, 3 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Oct 2025 | PR03 Regular replenishment | 245 | Rp 12,497 | 14 Nov 2025 | 31 d |
| 23 Sept 2025 | PR03 Regular replenishment | 111 | Rp 12,161 | 18 Oct 2025 | 25 d |
| 07 Sept 2025 | PR06 Regular replenishment | 183 | Rp 12,447 | 28 Sept 2025 | 21 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Aug 2026 | Medium | PX_PP-1121 | Oil leak at PP-1121 bearing housing |
| 30 Jul 2026 | Low | PX_TCV-1256 | TCV-1256; IA leak from regulator |
| 29 Jul 2026 | Medium | PX_TCV-1256 | Overhaul TCV-1256 |
| 16 Apr 2026 | Medium | PX_TCV-1256 | Replace lamp as per PM finding |
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 16 May 2025 | Medium | PX_PP-1121 | Replace lamp as per PM finding |
| 05 May 2025 | Low | PX_PCV-1300 | Replace lamp as per PM finding |
| 05 May 2025 | Medium | PX_TCV-1256 | Overhaul TCV-1256 |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Sept 2026 | 16 | 201000031484 | Corrective |
| 25 Jul 2026 | 4 | 201000003691 | Corrective |
| 05 Jul 2026 | 32 | 201000008893 | Corrective |
| 23 Jun 2026 | 24 | 201000016655 | Corrective |
| 01 Jun 2026 | 96 | 201000022564 | Corrective |
| 25 May 2026 | 16 | 201000019190 | Corrective |
| 11 Jan 2026 | 12 | 201000021895 | Corrective |
| 06 Jan 2026 | 16 | 201000028375 | Corrective |
| 24 Dec 2025 | 24 | 203000001878 | Turnaround |
| 17 Dec 2025 | 32 | 201000035232 | Corrective |
| 04 Dec 2025 | 96 | 201000009071 | Corrective |
| 19 Nov 2025 | 4 | 201000022928 | Corrective |
| 24 Oct 2025 | 32 | 201000001926 | Corrective |
| 20 Sept 2025 | 48 | 201000025818 | Corrective |
| 28 Aug 2025 | 32 | 201000002071 | Corrective |