Sparely
DU

STUDBOLT,5/8INX105MM,B16/4

Material 4100024639 · STUDBOLT · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100024639
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 16 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
31 d · P80 37 d
Unit price
Rp 84,657

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 115 EA/year: 98 unplanned (recency-weighted compound poisson (own history)) + 17 from the maintenance plan.
  • 3.Lead time ~31 days; expected demand during lead time 8.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 56, order up to 172.
  • 5.Installed on 16 FuncLoc(s), 10 of them criticality A/B.
  • 6.ML early warning: 93% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 96Single sourceAbnormal consumption
On hand / on order
96 / 0
no open PO
Today Min / Max
46 / 112
static parameters in BoM
Rec. Min (reorder point)
56
safety stock 48
Rec. Max
172
order qty 116
Service level
99.9%
stockout risk now 0%
Unit price
Rp 84,657
PO history
ML early warning: 93% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 160 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (108 units) excluded from the baseline.

Demand pattern Lumpy · 10 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 16 functional locations

10 with criticality A/B · 252 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A2072.81
PX_HE-126D
DILUTION STEAM PREHEATER
A851.08
PX_CL-859
FLUSHING OIL SCRUBBER
A2420.81
PX_HE-149A
HYDROGEN COOLER
A420.65
PX_TCV-264
PP-205B TEMP CONTROL
A2400.12
PX_CL-1871
CHARGE GAS SCRUBBER
B462.09
PX_HE-632B
RECYCLE ETHANE TLE
B2420.65
PX_HE-224C
GASOLINE REBOILER
B2410.22
PX_LCV-413
HE-1635C LEVEL CONTROL
B1600.12
PX_PP-615A
PROPYLENE PUMP
B2400.19
PX_12-LS-16976-A22A
PIPE-12 FROM PP-1022 TO VD-1192
C1600.01
PX_PRV-1934
SAFETY VALVE VD-1338
C400.04

Lead time and procurement

Lead time 31 ± 21 days (PO history, 10 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
11 Aug 2026PR05
Project / turnaround
105Rp 80,20902 Sept 202622 d
06 Aug 2026PR06
Regular replenishment
183Rp 79,90824 Aug 202618 d
21 May 2026PR03
Regular replenishment
122Rp 85,94619 Jun 202629 d
15 May 2026PR03
Regular replenishment
186Rp 85,21829 May 202614 d
17 Apr 2026PR01
Import / long-lead
58Rp 81,61506 Jul 202680 d
14 Apr 2026PR03
Regular replenishment
163Rp 84,70811 May 202627 d
02 Aug 2025PR06
Regular replenishment
154Rp 84,60619 Aug 202517 d
19 Jul 2025PR03
Regular replenishment
140Rp 86,49317 Aug 202529 d
18 Jun 2025PR06
Regular replenishment
150Rp 83,34227 Aug 202570 d
08 Jun 2025PR06
Regular replenishment
157Rp 86,60406 Jul 202528 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Jan 2027PX_PP-615APump overhaul17.2

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Sept 2026MediumPX_PRV-1103BRecertification PRV-1103B
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
29 Aug 2026LowPX_HE-126DReplace lamp as per PM finding
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
06 Jul 2026MediumPX_HE-126DInstall scaffolding at HE-126D
12 Jun 2026MediumPX_CL-1871Leak from packing
11 Jun 2026MediumPX_CL-1871Replace lamp as per PM finding
13 May 2026MediumPX_CL-1871Install scaffolding at CL-1871

Recent goods issues

Posting dateQtyOrderOrder type
24 Apr 20264201000002099Corrective
30 Jan 20268201000013677Corrective
18 Jan 20264201000005422Corrective
17 Nov 202596201000004355Corrective
06 Nov 202596203000039255Turnaround
04 Nov 202596201000028795Corrective
23 Sept 20258201000009723Corrective
19 Sept 202596201000011776Corrective
16 Sept 202512201000009640Corrective
25 Aug 202512203000020904Turnaround
24 Aug 20258201000036234Corrective
26 May 202516201000007863Corrective