STUDBOLT,3/4INX80MM,B7/2H

Material 4100024659 · STUDBOLT · Plant 1000

ASafety-criticalReorderCriticalSlow-moving
Material
4100024659
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 17 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
25 d · P80 34 d
Unit price
Rp 50,409

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 604 EA/year: 604 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~25 days; expected demand during lead time 41.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 288, order up to 712.
  • 5.On hand 13 + on order 0 is at or below the reorder point: order 699 now.
  • 6.Installed on 17 FuncLoc(s), 10 of them criticality A/B.
  • 7.ML early warning: 41% probability of demand in the next 90 days.
Proposed purchase requisition
699 EA
Rp 35.2M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
13 / 0
no open PO
Today Min / Max
11 / 21
static parameters in BoM
Rec. Min (reorder point)
288
safety stock 248
Rec. Max
712
order qty 424
Service level
99.9%
stockout risk now 35%
Unit price
Rp 50,409
PO history
ML early warning: 41% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 340 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (96 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 17 functional locations

10 with criticality A/B · 220 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1729A
COOLING WATER PUMP
A24217.90
PX_KC-247A
SLOP OIL FAN
A2494.00
PX_KT-419A
TURBINE FOR KC-419A
A862.81
PX_HE-388A
CHARGE GAS EXCHANGER
A451.93
PX_KT-308B
TURBINE FOR KC-308B
A401.10
PX_PRV-1300
SAFETY VALVE HE-874B
A2400.04
PX_VD-1350
FUEL OIL SURGE DRUM
A1200.08
PX_HE-344D
BFW PREHEATER
B810.65
PX_PP-490A
REFLUX PUMP
B810.19
PX_HE-935A
LUBE OIL CONDENSER
B1600.22
PX_3-P-25182-A51A-C
PIPE-3 FROM HE-895C TO PP-154A
C1600.01
PX_3/4-CW-27934-A51A-T
PIPE-3/4 FROM KC-930C TO PP-506A
C1200.01

Lead time and procurement

Lead time 25 ± 14 days (PO history, 4 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
06 Sept 2025PR03
Regular replenishment
58Rp 50,19421 Oct 202545 d
25 Jul 2025PR03
Regular replenishment
57Rp 47,05414 Aug 202520 d
07 Jun 2025PR03
Regular replenishment
68Rp 50,62319 Jun 202512 d
15 May 2025PR05
Project / turnaround
59Rp 50,92510 Jun 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-1729AInstall scaffolding at PP-1729A
24 Sept 2026MediumPX_HE-388AReplace lamp as per PM finding
20 Sept 2026LowPX_PP-1729A[MSI-B-26-TCT-349] Permanent repair
28 Aug 2026EmergencyPX_PP-1729AInstall scaffolding at PP-1729A
27 Aug 2026HighPX_KC-247AInspect coupling KC-247A
11 Aug 2026MediumPX_PP-1729APP-1729A seal leak
05 Aug 2026MediumPX_HE-388AHE-388A fouling
14 Jul 2026MediumPX_KC-247AReplace lamp as per PM finding
29 Jun 2026LowPX_KC-247AKC-247A high vibration
23 Jun 2026LowPX_HE-388AInstall scaffolding at HE-388A

Recent goods issues

Posting dateQtyOrderOrder type
26 Oct 202596201000020772Corrective
29 Aug 202596203000006603Turnaround