STUDBOLT,3/4INX80MM,B7/2H
Material 4100024659 · STUDBOLT · Plant 1000
ASafety-criticalReorderCriticalSlow-moving
- Material
- 4100024659
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (10 of 17 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 25 d · P80 34 d
- Unit price
- Rp 50,409
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 604 EA/year: 604 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~25 days; expected demand during lead time 41.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 288, order up to 712.
- 5.On hand 13 + on order 0 is at or below the reorder point: order 699 now.
- 6.Installed on 17 FuncLoc(s), 10 of them criticality A/B.
- 7.ML early warning: 41% probability of demand in the next 90 days.
Proposed purchase requisition
699 EA
Rp 35.2M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
13 / 0
no open PO
Today Min / Max
11 / 21
static parameters in BoM
Rec. Min (reorder point)
288
safety stock 248
Rec. Max
712
order qty 424
Service level
99.9%
stockout risk now 35%
Unit price
Rp 50,409
PO history
ML early warning: 41% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 340 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (96 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 17 functional locations
10 with criticality A/B · 220 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1729A COOLING WATER PUMP | A | 24 | 21 | 7.90 |
| PX_KC-247A SLOP OIL FAN | A | 24 | 9 | 4.00 |
| PX_KT-419A TURBINE FOR KC-419A | A | 8 | 6 | 2.81 |
| PX_HE-388A CHARGE GAS EXCHANGER | A | 4 | 5 | 1.93 |
| PX_KT-308B TURBINE FOR KC-308B | A | 4 | 0 | 1.10 |
| PX_PRV-1300 SAFETY VALVE HE-874B | A | 24 | 0 | 0.04 |
| PX_VD-1350 FUEL OIL SURGE DRUM | A | 12 | 0 | 0.08 |
| PX_HE-344D BFW PREHEATER | B | 8 | 1 | 0.65 |
| PX_PP-490A REFLUX PUMP | B | 8 | 1 | 0.19 |
| PX_HE-935A LUBE OIL CONDENSER | B | 16 | 0 | 0.22 |
| PX_3-P-25182-A51A-C PIPE-3 FROM HE-895C TO PP-154A | C | 16 | 0 | 0.01 |
| PX_3/4-CW-27934-A51A-T PIPE-3/4 FROM KC-930C TO PP-506A | C | 12 | 0 | 0.01 |
Lead time and procurement
Lead time 25 ± 14 days (PO history, 4 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Sept 2025 | PR03 Regular replenishment | 58 | Rp 50,194 | 21 Oct 2025 | 45 d |
| 25 Jul 2025 | PR03 Regular replenishment | 57 | Rp 47,054 | 14 Aug 2025 | 20 d |
| 07 Jun 2025 | PR03 Regular replenishment | 68 | Rp 50,623 | 19 Jun 2025 | 12 d |
| 15 May 2025 | PR05 Project / turnaround | 59 | Rp 50,925 | 10 Jun 2025 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Medium | PX_PP-1729A | Install scaffolding at PP-1729A |
| 24 Sept 2026 | Medium | PX_HE-388A | Replace lamp as per PM finding |
| 20 Sept 2026 | Low | PX_PP-1729A | [MSI-B-26-TCT-349] Permanent repair |
| 28 Aug 2026 | Emergency | PX_PP-1729A | Install scaffolding at PP-1729A |
| 27 Aug 2026 | High | PX_KC-247A | Inspect coupling KC-247A |
| 11 Aug 2026 | Medium | PX_PP-1729A | PP-1729A seal leak |
| 05 Aug 2026 | Medium | PX_HE-388A | HE-388A fouling |
| 14 Jul 2026 | Medium | PX_KC-247A | Replace lamp as per PM finding |
| 29 Jun 2026 | Low | PX_KC-247A | KC-247A high vibration |
| 23 Jun 2026 | Low | PX_HE-388A | Install scaffolding at HE-388A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Oct 2025 | 96 | 201000020772 | Corrective |
| 29 Aug 2025 | 96 | 203000006603 | Turnaround |